IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

157,906

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0269 # 02 Y:1985 02 1985 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,040 $3,935 Implemented
GT0269 # 03 Y:1985 03 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,000 $300 Implemented
GT0269 # 04 Y:1985 04 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,960 $0 Implemented
GT0272 # 01 Y:1985 01 1985 USE HEAT PUMP FOR SPACE CONDITIONING $3,480 $10,000 Not Implemented
GT0272 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,331 $455 Implemented
GT0272 # 03 Y:1985 03 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $347 $250 Implemented
GT0273 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,310 $248 Implemented
GT0273 # 02 Y:1985 02 1985 INSTALL / REPAIR INSULATION ON STEAM LINES $1,390 $865 Implemented
GT0273 # 03 Y:1985 03 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $239 $339 Implemented
GT0273 # 04 Y:1985 04 1985 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $4,940 $20,000 Implemented
GT0273 # 05 Y:1985 05 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,570 $1,000 Implemented
GT0275 # 01 Y:1985 01 1985 INSTALL SET-BACK TIMERS $1,780 $0 Implemented
GT0275 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,112 $840 Implemented
GT0275 # 03 Y:1985 03 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $197 $217 Implemented
GT0275 # 04 Y:1985 04 1985 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,210 $45,000 Not Implemented
CO0041 # 13 Y:1985 13 1985 REDESIGN PROCESS $1,481 $1,140 Not Implemented
CO0041 # 14 Y:1985 14 1985 IMPROVE LUBRICATION PRACTICES $882 $100 Not Implemented
CO0042 # 01 Y:1985 01 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,853 $645 Implemented
CO0042 # 02 Y:1985 02 1985 TURN OFF EQUIPMENT WHEN NOT IN USE $6,858 $450 Not Implemented
CO0042 # 03 Y:1985 03 1985 TURN OFF EQUIPMENT WHEN NOT IN USE $91 $100 Not Implemented
CO0042 # 04 Y:1985 04 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,923 $600 Not Implemented
CO0042 # 05 Y:1985 05 1985 RECOVER WASTE HEAT FROM EQUIPMENT $283 $200 Implemented
CO0042 # 06 Y:1985 06 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $69 $100 Not Implemented
CO0042 # 07 Y:1985 07 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,926 $200 Implemented
CO0042 # 08 Y:1985 08 1985 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,256 $2,000 Not Implemented