Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
163,060
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TN0337 # 03 Y:1988 | 03 | 1988 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,896 | $1,110 | Implemented |
TN0337 # 04 Y:1988 | 04 | 1988 | REPAIR AND ELIMINATE STEAM LEAKS | $771 | $225 | Implemented |
TN0337 # 05 Y:1988 | 05 | 1988 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,271 | $0 | Not Implemented |
TN0337 # 06 Y:1988 | 06 | 1988 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,144 | $0 | Not Implemented |
TN0337 # 07 Y:1988 | 07 | 1988 | IMPROVE LUBRICATION PRACTICES | $411 | $600 | Not Implemented |
TN0337 # 08 Y:1988 | 08 | 1988 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $411 | $385 | Not Implemented |
UD0256 # 01 Y:1988 | 01 | 1988 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $473 | $0 | Implemented |
UD0256 # 02 Y:1988 | 02 | 1988 | RECOVER WASTE HEAT FROM EQUIPMENT | $407 | $500 | Implemented |
UD0256 # 03 Y:1988 | 03 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $347 | $525 | Implemented |
UD0256 # 04 Y:1988 | 04 | 1988 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,641 | $540 | Implemented |
UD0256 # 05 Y:1988 | 05 | 1988 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $894 | $4,000 | Not Implemented |
WI0022 # 01 Y:1988 | 01 | 1988 | IMPROVE LUBRICATION PRACTICES | $9,403 | $0 | Implemented |
WI0022 # 02 Y:1988 | 02 | 1988 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,715 | $0 | Implemented |
WI0022 # 03 Y:1988 | 03 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,405 | $196 | Implemented |
WI0022 # 04 Y:1988 | 04 | 1988 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $220 | $500 | Implemented |
WI0022 # 05 Y:1988 | 05 | 1988 | AIR CONDITION ONLY SPACE NECESSARY | $1,625 | $2,500 | Implemented |
WI0022 # 06 Y:1988 | 06 | 1988 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $3,127 | $5,000 | Not Implemented |
WI0023 # 01 Y:1988 | 01 | 1988 | IMPROVE LUBRICATION PRACTICES | $2,680 | $0 | Not Implemented |
WI0023 # 02 Y:1988 | 02 | 1988 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $327 | $500 | Implemented |
WI0023 # 03 Y:1988 | 03 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $259 | $163 | Implemented |
WI0023 # 04 Y:1988 | 04 | 1988 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $716 | $500 | Implemented |
WI0023 # 05 Y:1988 | 05 | 1988 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $104 | $0 | Implemented |
WI0018 # 01 Y:1988 | 01 | 1988 | IMPROVE LUBRICATION PRACTICES | $515 | $0 | Implemented |
WI0018 # 02 Y:1988 | 02 | 1988 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $258 | $0 | Implemented |
WI0018 # 03 Y:1988 | 03 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,989 | $4,059 | Not Implemented |