Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
163,048
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
RU0016 # 04 Y:1988 | 04 | 1988 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $828 | $500 | Implemented |
RU0016 # 05 Y:1988 | 05 | 1988 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $999 | $2,000 | Implemented |
RU0017 # 01 Y:1988 | 01 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,392 | $262 | Implemented |
RU0017 # 02 Y:1988 | 02 | 1988 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $4,029 | $2,200 | Implemented |
RU0017 # 03 Y:1988 | 03 | 1988 | IMPROVE LUBRICATION PRACTICES | $614 | $0 | Not Implemented |
RU0017 # 04 Y:1988 | 04 | 1988 | COVER OPEN TANKS | $875 | $100 | Implemented |
RU0017 # 05 Y:1988 | 05 | 1988 | INSTALL TIMERS AND/OR THERMOSTATS | $5,472 | $5,900 | Not Implemented |
RU0017 # 06 Y:1988 | 06 | 1988 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $2,496 | $0 | Implemented |
OR0016 # 01 Y:1988 | 01 | 1988 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,173 | $0 | Implemented |
OR0016 # 02 Y:1988 | 02 | 1988 | INSTALL SET-BACK TIMERS | $4,547 | $270 | Implemented |
OR0016 # 03 Y:1988 | 03 | 1988 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,304 | $200 | Implemented |
OR0016 # 04 Y:1988 | 04 | 1988 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $147 | $200 | Implemented |
OR0016 # 05 Y:1988 | 05 | 1988 | OPTIMIZE PLANT POWER FACTOR | $1,972 | $4,110 | Not Implemented |
OR0017 # 01 Y:1988 | 01 | 1988 | USE MINIMUM STEAM OPERATING PRESSURE | $326 | $0 | Implemented |
OR0017 # 02 Y:1988 | 02 | 1988 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $818 | $0 | Not Implemented |
OR0017 # 03 Y:1988 | 03 | 1988 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $2,710 | $0 | Implemented |
OR0017 # 04 Y:1988 | 04 | 1988 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $6,291 | $0 | Implemented |
OR0017 # 05 Y:1988 | 05 | 1988 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,466 | $300 | Implemented |
OR0017 # 06 Y:1988 | 06 | 1988 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $150 | $76 | Not Implemented |
OR0017 # 07 Y:1988 | 07 | 1988 | RECOVER AND REUSE COOLING WATER | $502 | $320 | Not Implemented |
OR0017 # 08 Y:1988 | 08 | 1988 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $276 | $298 | Not Implemented |
OR0017 # 09 Y:1988 | 09 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $518 | $997 | Implemented |
OK0240 # 01 Y:1987 | 01 | 1987 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,147 | $5,000 | Implemented |
OK0240 # 02 Y:1987 | 02 | 1987 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,153 | $0 | Implemented |
OK0240 # 03 Y:1987 | 03 | 1987 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,092 | $0 | Implemented |