Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,602
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TR0008 # 05 Y:2018 | 05 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $534 | $2,128 | Implemented |
TR0008 # 06 Y:2018 | 06 | 2018 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $3,464 | $0 | Not Implemented |
TR0009 # 01 Y:2018 | 01 | 2018 | OPTIMIZE PLANT POWER FACTOR | $3,043 | $12,500 | Not Implemented |
TR0009 # 02 Y:2018 | 02 | 2018 | RECYCLE FLUORESCENT LAMPS | $6,608 | $13,260 | Implemented |
TR0009 # 03 Y:2018 | 03 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $814 | $0 | Not Implemented |
TR0009 # 04 Y:2018 | 04 | 2018 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $2,987 | $15,373 | Implemented |
TR0009 # 05 Y:2018 | 05 | 2018 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $17,718 | $3,748 | Not Implemented |
TR0009 # 06 Y:2018 | 06 | 2018 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $1,315 | $14,000 | Implemented |
AM0756 # 01 Y:2018 | 01 | 2018 | OPTIMIZE PLANT POWER FACTOR | $7,920 | $17,500 | Not Implemented |
AM0756 # 02 Y:2018 | 02 | 2018 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $46,750 | $5,000 | Not Implemented |
AM0756 # 03 Y:2018 | 03 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $37,900 | $117,500 | Not Implemented |
AM0756 # 04 Y:2018 | 04 | 2018 | USE SYNTHETIC LUBRICANT | $4,285 | $300 | Implemented |
AM0756 # 05 Y:2018 | 05 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,630 | $300 | Not Implemented |
AM0756 # 06 Y:2018 | 06 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,410 | $12,110 | Not Implemented |
AM0756 # 07 Y:2018 | 07 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $245 | $8 | Not Implemented |
AM0756 # 08 Y:2018 | 08 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $280 | $300 | Not Implemented |
AM0755 # 01 Y:2018 | 01 | 2018 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $450 | $1,970 | Not Implemented |
AM0755 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,310 | $3,750 | Implemented |
AM0755 # 03 Y:2018 | 03 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,175 | $500 | Implemented |
AM0755 # 04 Y:2018 | 04 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,040 | $1,070 | Not Implemented |
AM0755 # 05 Y:2018 | 05 | 2018 | INSTALL OCCUPANCY SENSORS | $555 | $540 | Not Implemented |
AM0755 # 06 Y:2018 | 06 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $425 | $205 | Implemented |
AM0755 # 07 Y:2018 | 07 | 2018 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $450 | $30 | Implemented |
AM0755 # 08 Y:2018 | 08 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $255 | $4 | Not Implemented |
AM0754 # 01 Y:2018 | 01 | 2018 | INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER | $63,539 | $195,000 | Implemented |