IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,602

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TR0008 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $534 $2,128 Implemented
TR0008 # 06 Y:2018 06 2018 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $3,464 $0 Not Implemented
TR0009 # 01 Y:2018 01 2018 OPTIMIZE PLANT POWER FACTOR $3,043 $12,500 Not Implemented
TR0009 # 02 Y:2018 02 2018 RECYCLE FLUORESCENT LAMPS $6,608 $13,260 Implemented
TR0009 # 03 Y:2018 03 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $814 $0 Not Implemented
TR0009 # 04 Y:2018 04 2018 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $2,987 $15,373 Implemented
TR0009 # 05 Y:2018 05 2018 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $17,718 $3,748 Not Implemented
TR0009 # 06 Y:2018 06 2018 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $1,315 $14,000 Implemented
AM0756 # 01 Y:2018 01 2018 OPTIMIZE PLANT POWER FACTOR $7,920 $17,500 Not Implemented
AM0756 # 02 Y:2018 02 2018 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $46,750 $5,000 Not Implemented
AM0756 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,900 $117,500 Not Implemented
AM0756 # 04 Y:2018 04 2018 USE SYNTHETIC LUBRICANT $4,285 $300 Implemented
AM0756 # 05 Y:2018 05 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,630 $300 Not Implemented
AM0756 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,410 $12,110 Not Implemented
AM0756 # 07 Y:2018 07 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $245 $8 Not Implemented
AM0756 # 08 Y:2018 08 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $280 $300 Not Implemented
AM0755 # 01 Y:2018 01 2018 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $450 $1,970 Not Implemented
AM0755 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,310 $3,750 Implemented
AM0755 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,175 $500 Implemented
AM0755 # 04 Y:2018 04 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,040 $1,070 Not Implemented
AM0755 # 05 Y:2018 05 2018 INSTALL OCCUPANCY SENSORS $555 $540 Not Implemented
AM0755 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $425 $205 Implemented
AM0755 # 07 Y:2018 07 2018 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $450 $30 Implemented
AM0755 # 08 Y:2018 08 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $255 $4 Not Implemented
AM0754 # 01 Y:2018 01 2018 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER $63,539 $195,000 Implemented