Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,500
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TN0645 # 02 Y:1998 | 02 | 1998 | RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | $277,345 | $644,800 | Not Implemented |
TN0645 # 03 Y:1998 | 03 | 1998 | REDUCE SOLUTION DRAG-OUT TO PREVENT SOLUTION LOSS | $237,600 | $153,485 | Not Implemented |
TN0645 # 04 Y:1998 | 04 | 1998 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $221,455 | $70,000 | Not Implemented |
TN0645 # 05 Y:1998 | 05 | 1998 | INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION | $198,225 | $250,000 | Not Implemented |
TN0645 # 06 Y:1998 | 06 | 1998 | USE A DIFFERENT OR RECYCLED RAW MATERIAL | $51,945 | $200,000 | Not Implemented |
TN0645 # 07 Y:1998 | 07 | 1998 | USE DEIONIZED WATER IN UPSTREAM RINSE TANKS | $48,650 | $120,000 | Not Implemented |
TN0645 # 08 Y:1998 | 08 | 1998 | TREAT AND REUSE RINSE WATERS | $28,105 | $69,200 | Not Implemented |
TN0645 # 09 Y:1998 | 09 | 1998 | INSTALL SET-BACK TIMERS | $15,755 | $1,555 | Not Implemented |
TN0645 # 10 Y:1998 | 10 | 1998 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $9,390 | $8,000 | Implemented |
TN0645 # 11 Y:1998 | 11 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,880 | $5,000 | Implemented |
TN0645 # 12 Y:1998 | 12 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $6,310 | $1,120 | Not Implemented |
TN0645 # 13 Y:1998 | 13 | 1998 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $2,780 | $14,300 | Not Implemented |
OD0123 # 01 Y:1998 | 01 | 1998 | USE OPTIMUM THICKNESS INSULATION | $7,666 | $21,040 | Not Implemented |
OD0123 # 02 Y:1998 | 02 | 1998 | INSTALL OCCUPANCY SENSORS | $609 | $200 | Not Implemented |
OD0123 # 03 Y:1998 | 03 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $592 | $1,290 | Not Implemented |
OD0123 # 04 Y:1998 | 04 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,239 | $16,477 | Not Implemented |
OD0122 # 01 Y:1998 | 01 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,564 | $3,171 | Not Implemented |
OD0122 # 02 Y:1998 | 02 | 1998 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,277 | $150 | Not Implemented |
OD0122 # 03 Y:1998 | 03 | 1998 | INSTALL OCCUPANCY SENSORS | $932 | $200 | Not Implemented |
OD0122 # 04 Y:1998 | 04 | 1998 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $248 | $20 | Not Implemented |
OD0122 # 05 Y:1998 | 05 | 1998 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $1,545 | $93 | Implemented |
OD0122 # 06 Y:1998 | 06 | 1998 | INSTALL TIMERS AND/OR THERMOSTATS | $2,871 | $1,050 | Implemented |
OD0121 # 01 Y:1998 | 01 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,192 | $6,908 | Implemented |
OD0121 # 02 Y:1998 | 02 | 1998 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $3,843 | $9,910 | Not Implemented |
OD0121 # 03 Y:1998 | 03 | 1998 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $241 | $420 | Implemented |