IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,756

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0254 # 07 Y:2018 07 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,370 $57,615 Implemented
SF0521 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,001 $1,610 Implemented
SF0521 # 02 Y:2018 02 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $130 $44 Implemented
SF0521 # 03 Y:2018 03 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,444 $3,798 Implemented
SF0521 # 04 Y:2018 04 2018 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,084 $2,146 Implemented
SF0521 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,270 $22,190 Implemented
SF0521 # 06 Y:2018 06 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,634 $44,294 Implemented
SF0521 # 07 Y:2018 07 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $28,263 $61,175 Implemented
SF0521 # 08 Y:2018 08 2018 USE SOLAR HEAT TO MAKE ELECTRICTY $94,006 $487,058 Implemented
GT0914 # 01 Y:2018 01 2018 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $56,321 $400 Not Implemented
GT0914 # 02 Y:2018 02 2018 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $18,164 $400 Implemented
GT0914 # 03 Y:2018 03 2018 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $11,239 $400 Not Implemented
GT0914 # 04 Y:2018 04 2018 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $8,805 $400 Not Implemented
GT0914 # 05 Y:2018 05 2018 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,028 $800 Not Implemented
GT0914 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $42,676 $26,357 Implemented
WM0121 # 01 Y:2018 01 2018 RECOVER WASTE HEAT FROM EQUIPMENT $34,154 $54,000 Not Implemented
WM0121 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,043 $20,000 Implemented
WM0121 # 03 Y:2018 03 2018 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $25,239 $23,000 Not Implemented
WM0121 # 04 Y:2018 04 2018 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $13,055 $52,350 Not Implemented
WM0121 # 05 Y:2018 05 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12,568 $12,240 Implemented
WM0121 # 06 Y:2018 06 2018 INSTALL OCCUPANCY SENSORS $10,644 $10,926 Implemented
WM0121 # 07 Y:2018 07 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,876 $3,060 Not Implemented
WM0121 # 08 Y:2018 08 2018 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,741 $7,920 Implemented
WM0121 # 09 Y:2018 09 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,083 $4,115 Not Implemented
WM0121 # 10 Y:2018 10 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,625 $2,330 Implemented