IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

164,842

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LT0121 # 03 Y:1988 03 1988 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $472 $268 Not Implemented
LT0121 # 04 Y:1988 04 1988 INSTALL TIMERS AND/OR THERMOSTATS $553 $150 Not Implemented
WI0037 # 01 Y:1988 01 1988 IMPROVE LUBRICATION PRACTICES $3,862 $0 Not Implemented
WI0037 # 02 Y:1988 02 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,535 $0 Implemented
WI0037 # 03 Y:1988 03 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $43,747 $33,748 Implemented
WI0037 # 04 Y:1988 04 1988 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $885 $1,000 Implemented
WI0037 # 05 Y:1988 05 1988 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,732 $0 Implemented
WI0037 # 06 Y:1988 06 1988 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,189 $0 Implemented
WI0037 # 07 Y:1988 07 1988 RECOVER WASTE HEAT FROM EQUIPMENT $2,695 $1,500 Implemented
WI0037 # 08 Y:1988 08 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $385 $500 Not Implemented
WI0038 # 01 Y:1988 01 1988 IMPROVE LUBRICATION PRACTICES $2,820 $0 Not Implemented
WI0038 # 02 Y:1988 02 1988 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $606 $700 Not Implemented
WI0038 # 03 Y:1988 03 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $953 $1,000 Implemented
WI0038 # 04 Y:1988 04 1988 INSULATE BARE EQUIPMENT $174 $500 Not Implemented
WI0038 # 05 Y:1988 05 1988 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,340 $1,400 Not Implemented
WI0039 # 01 Y:1988 01 1988 IMPROVE LUBRICATION PRACTICES $5,741 $0 Not Implemented
WI0039 # 02 Y:1988 02 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,762 $0 Implemented
WI0039 # 03 Y:1988 03 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,771 $514 Implemented
WI0039 # 04 Y:1988 04 1988 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,175 $1,400 Implemented
WI0039 # 05 Y:1988 05 1988 SHUT OFF PILOTS IN STANDBY EQUIPMENT $274 $0 Implemented
GT0339 # 01 Y:1988 01 1988 ISOLATE HOT OR COLD EQUIPMENT $479 $1,000 Not Implemented
GT0339 # 02 Y:1988 02 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,008 $0 Implemented
GT0339 # 03 Y:1988 03 1988 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,170 $6,600 Implemented
GT0339 # 04 Y:1988 04 1988 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $50 $0 Implemented
GT0339 # 05 Y:1988 05 1988 USE DEMAND CONTROLLER OR LOAD SHEDDER $10,750 $10,300 Not Implemented