IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

163,737

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0301 # 05 Y:1987 05 1987 INSTALL SET-BACK TIMERS $320 $445 Not Implemented
TN0305 # 01 Y:1987 01 1987 SHUT OFF PILOTS IN STANDBY EQUIPMENT $2,479 $0 Implemented
TN0305 # 02 Y:1987 02 1987 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $2,347 $120 Not Implemented
TN0305 # 03 Y:1987 03 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,298 $210 Implemented
TN0305 # 04 Y:1987 04 1987 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,592 $1,315 Not Implemented
TN0305 # 05 Y:1987 05 1987 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,297 $0 Not Implemented
TN0305 # 06 Y:1987 06 1987 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,034 $348 Implemented
TN0305 # 07 Y:1987 07 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $526 $120 Implemented
CO0086 # 01 Y:1987 01 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $12,235 $300 Implemented
CO0086 # 02 Y:1987 02 1987 REPAIR AND ELIMINATE STEAM LEAKS $8,294 $3,331 Implemented
CO0086 # 03 Y:1987 03 1987 INSTALL TURBULATORS $5,059 $1,700 Not Implemented
CO0086 # 04 Y:1987 04 1987 INSTALL / REPAIR INSULATION ON STEAM LINES $7,419 $16,669 Implemented
CO0086 # 05 Y:1987 05 1987 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,077 $16,800 Not Implemented
CO0086 # 06 Y:1987 06 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,421 $400 Implemented
CO0086 # 07 Y:1987 07 1987 IMPROVE LUBRICATION PRACTICES $1,968 $0 Not Implemented
CO0086 # 08 Y:1987 08 1987 RECOVER WASTE HEAT FROM EQUIPMENT $784 $200 Implemented
CO0086 # 09 Y:1987 09 1987 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $24,041 $70 Implemented
CO0086 # 10 Y:1987 10 1987 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $18,372 $500 Implemented
CO0086 # 11 Y:1987 11 1987 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $372 $869 Not Implemented
CO0086 # 12 Y:1987 12 1987 TURN OFF EQUIPMENT WHEN NOT IN USE $2,289 $700 Implemented
CO0086 # 13 Y:1987 13 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $559 $589 Not Implemented
KU0214 # 01 Y:1987 01 1987 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,053 $0 Not Implemented
KU0214 # 02 Y:1987 02 1987 INSTALL AUTOMATIC STACK DAMPER $602 $1,050 Not Implemented
KU0214 # 03 Y:1987 03 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $590 $2,593 Implemented
KU0214 # 04 Y:1987 04 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $351 $100 Implemented