IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,969

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0468 # 01 Y:2000 01 2000 USE OTHER METHODS FOR NEUTRALIZATION $28,530 $100,000 Implemented
MA0468 # 02 Y:2000 02 2000 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $17,250 $47,030 Not Implemented
MA0468 # 03 Y:2000 03 2000 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $390 $440 Implemented
MA0468 # 04 Y:2000 04 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $304 $474 Implemented
MA0467 # 01 Y:2000 01 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,467 $640 Implemented
MA0467 # 02 Y:2000 02 2000 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $6,077 $4,000 Implemented
MA0467 # 03 Y:2000 03 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,974 $4,200 Implemented
MA0467 # 04 Y:2000 04 2000 INSULATE FEEDWATER TANK $1,316 $800 Not Implemented
MA0467 # 05 Y:2000 05 2000 INSULATE BARE EQUIPMENT $1,140 $1,500 Implemented
MA0467 # 06 Y:2000 06 2000 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $951 $500 Implemented
MA0467 # 07 Y:2000 07 2000 INSULATE FEEDWATER TANK $490 $1,100 Implemented
MA0465 # 01 Y:2000 01 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $34,550 $50,000 Not Implemented
MA0465 # 02 Y:2000 02 2000 OPTIMIZE PLANT POWER FACTOR $4,076 $4,125 Implemented
MA0465 # 03 Y:2000 03 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,682 $20,325 Not Implemented
MA0465 # 04 Y:2000 04 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $845 $528 Implemented
MA0465 # 05 Y:2000 05 2000 INSTALL / REPAIR INSULATION ON STEAM LINES $605 $400 Implemented
MA0463 # 01 Y:2000 01 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $203,441 $1,320,000 Not Implemented
MA0463 # 02 Y:2000 02 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $25,420 $120,000 Implemented
MA0463 # 03 Y:2000 03 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,123 $12,075 Not Implemented
MA0463 # 04 Y:2000 04 2000 OPTIMIZE PLANT POWER FACTOR $3,291 $9,600 Not Implemented
MA0463 # 05 Y:2000 05 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,745 $4,317 Implemented
MA0463 # 06 Y:2000 06 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $240 $420 Implemented
MA0464 # 01 Y:2000 01 2000 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE $15,077 $36,000 Not Implemented
MA0464 # 02 Y:2000 02 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $193 $0 Implemented
MA0464 # 03 Y:2000 03 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $145 $440 Implemented