IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,998

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0057 # 05 Y:1986 05 1986 USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC $2,262 $7,500 Implemented
MA0058 # 01 Y:1986 01 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,060 $90 Implemented
MA0058 # 02 Y:1986 02 1986 INSULATE BARE EQUIPMENT $3,740 $5,760 Implemented
MA0058 # 03 Y:1986 03 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,028 $0 Implemented
MA0059 # 01 Y:1986 01 1986 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,336 $3,400 Implemented
MA0059 # 02 Y:1986 02 1986 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $1,030 $2,025 Not Implemented
MA0059 # 03 Y:1986 03 1986 INSTALL TIMERS AND/OR THERMOSTATS $3,217 $2,300 Implemented
UD0195 # 03 Y:1986 03 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $312 $58 Not Implemented
UD0191 # 01 Y:1986 01 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,942 $7,500 Implemented
UD0192 # 01 Y:1986 01 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,234 $2,500 Implemented
UD0192 # 02 Y:1986 02 1986 REDUCE VENTILATION AIR $4,173 $2,500 Implemented
UD0193 # 01 Y:1986 01 1986 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $52,010 $16,000 Not Implemented
UD0193 # 02 Y:1986 02 1986 INSTALL STORM WINDOWS AND DOORS $12,529 $16,200 Not Implemented
UD0193 # 03 Y:1986 03 1986 INSTALL SET-BACK TIMERS $1,589 $0 Implemented
UD0193 # 04 Y:1986 04 1986 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,168 $0 Implemented
UD0194 # 01 Y:1986 01 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,611 $12,000 Implemented
UD0194 # 02 Y:1986 02 1986 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,065 $1,160 Implemented
UD0194 # 03 Y:1986 03 1986 RECOVER WASTE HEAT FROM EQUIPMENT $2,063 $1,000 Implemented
UD0194 # 04 Y:1986 04 1986 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $3,352 $1,500 Implemented
UD0195 # 01 Y:1986 01 1986 USE STEAM SPARGING OR INJECTIONS IN PLACE OF INDIRECT HEATING $10,751 $0 Implemented
UD0195 # 02 Y:1986 02 1986 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $418 $0 Implemented
UD0193 # 05 Y:1986 05 1986 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $9,134 $21,000 Implemented
KU0192 # 01 Y:1986 01 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,354 $200 Implemented
KU0192 # 02 Y:1986 02 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,299 $6,408 Implemented
KU0192 # 03 Y:1986 03 1986 AIR CONDITION ONLY SPACE NECESSARY $2,153 $1,032 Not Implemented