IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,394

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0560 # 04 Y:2004 04 2004 INSTALL OCCUPANCY SENSORS $317 $256 Implemented
MA0560 # 05 Y:2004 05 2004 DIRECT WARMEST AIR TO COMBUSTION INTAKE $230 $175 Implemented
NC0294 # 01 Y:2004 01 2004 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $19,084 $2,780 Implemented
NC0294 # 02 Y:2004 02 2004 ADD ADDITIONAL PRODUCTION SHIFT $17,395 $5,000 Not Implemented
NC0294 # 03 Y:2004 03 2004 REDESIGN PROCESS $9,178 $2,200 Not Implemented
NC0294 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $600 $100 Implemented
NC0294 # 05 Y:2004 05 2004 RECOVER WASTE HEAT FROM EQUIPMENT $8,102 $9,225 Implemented
UM0264 # 01 Y:2004 01 2004 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $47,250 $2,600 Implemented
UM0264 # 02 Y:2004 02 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $14,340 $12,530 n/a
UM0264 # 03 Y:2004 03 2004 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $7,700 $800 Not Implemented
UM0264 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,653 $9,433 Not Implemented
UM0264 # 05 Y:2004 05 2004 INSTALL OCCUPANCY SENSORS $2,270 $5,610 Not Implemented
UM0264 # 06 Y:2004 06 2004 INSULATE BARE EQUIPMENT $1,281 $509 Not Implemented
UM0264 # 07 Y:2004 07 2004 RECOVER WASTE HEAT FROM EQUIPMENT $1,670 $500 Not Implemented
UM0264 # 08 Y:2004 08 2004 COVER OPEN TANKS $379 $500 Not Implemented
UM0264 # 09 Y:2004 09 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $312 $200 Not Implemented
AS0388 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $50,081 $440 Implemented
AS0388 # 02 Y:2004 02 2004 INSULATE BARE EQUIPMENT $1,489 $815 Not Implemented
AS0388 # 03 Y:2004 03 2004 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE $366 $1,530 Not Implemented
AS0388 # 04 Y:2004 04 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $283 $800 Not Implemented
AS0388 # 05 Y:2004 05 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,196 $1,247 Not Implemented
AS0388 # 06 Y:2004 06 2004 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $953 $1,400 Not Implemented
AS0388 # 07 Y:2004 07 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,505 $1,477 Not Implemented
MA0562 # 01 Y:2004 01 2004 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $22,961 $139,400 Not Implemented
MA0562 # 02 Y:2004 02 2004 RECOVER WASTE HEAT FROM EQUIPMENT $10,584 $2,465 Implemented