IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,043

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0491 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,248 $11,314 Implemented
NC0491 # 06 Y:2013 06 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $576 $100 Implemented
IA0503 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,895 $202,405 Not Implemented
IA0503 # 02 Y:2013 02 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,231 $470 Not Implemented
IA0503 # 03 Y:2013 03 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $975 $2,238 Implemented
IA0503 # 04 Y:2013 04 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $530 $105 Not Implemented
IA0503 # 05 Y:2013 05 2013 OPTIMIZE PLANT POWER FACTOR $15,108 $8,304 Implemented
IA0503 # 06 Y:2013 06 2013 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,063 $2,204 Implemented
OK0862 # 01 Y:2013 01 2013 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $2,733 $0 Implemented
OK0862 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,745 $52,650 Not Implemented
OK0862 # 03 Y:2013 03 2013 INSTALL OCCUPANCY SENSORS $3,000 $2,520 Implemented
OK0862 # 04 Y:2013 04 2013 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $600 $0 Not Implemented
OK0862 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,426 $53,400 Not Implemented
OK0862 # 06 Y:2013 06 2013 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,177 $8,000 Not Implemented
OK0862 # 07 Y:2013 07 2013 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $7,599 $12,000 Not Implemented
CO0673 # 01 Y:2013 01 2013 INSULATE BARE EQUIPMENT $7,680 $8,440 Not Implemented
CO0673 # 02 Y:2013 02 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,190 $20,600 Not Implemented
CO0673 # 03 Y:2013 03 2013 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $3,060 $4,216 Implemented
CO0673 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,910 $530 Implemented
CO0673 # 05 Y:2013 05 2013 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $5,240 $0 Implemented
CO0673 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,160 $6,540 Not Implemented
CO0672 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,070 $250 Implemented
CO0672 # 02 Y:2013 02 2013 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $16,940 $58,410 Not Implemented
CO0672 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,690 $5,660 Not Implemented
CO0672 # 04 Y:2013 04 2013 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,600 $500 Not Implemented