Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
159,759
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0151 # 04 Y:1984 | 04 | 1984 | AIR CONDITION ONLY SPACE NECESSARY | $334 | $0 | Implemented |
OK0151 # 05 Y:1984 | 05 | 1984 | DE-ENERGIZE EXCESS TRANSFORMER CAPACITY | $984 | $0 | Not Implemented |
OK0152 # 01 Y:1984 | 01 | 1984 | INSTALL TIMERS AND/OR THERMOSTATS | $146 | $250 | Not Implemented |
OK0152 # 02 Y:1984 | 02 | 1984 | RECOVER WASTE HEAT FROM EQUIPMENT | $196 | $530 | Implemented |
OK0152 # 03 Y:1984 | 03 | 1984 | USE WATER ON AIR CONDITIONING EXCHANGER TO IMPROVE HEAT TRANSFER AND INCREASE AIR CONDITIONER EFFICIENCY | $292 | $480 | Implemented |
OK0152 # 04 Y:1984 | 04 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $292 | $134 | Implemented |
OK0152 # 05 Y:1984 | 05 | 1984 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $204 | $0 | Implemented |
OK0152 # 06 Y:1984 | 06 | 1984 | INSTALL SET-BACK TIMERS | $409 | $0 | Not Implemented |
OK0152 # 07 Y:1984 | 07 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $117 | $124 | Implemented |
OK0152 # 08 Y:1984 | 08 | 1984 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $58 | $58 | Implemented |
TS0003 # 01 Y:1984 | 01 | 1984 | MINIMIZE WATER USAGE | $3,197 | $6 | Implemented |
TS0003 # 02 Y:1984 | 02 | 1984 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,050 | $1,400 | Implemented |
TS0003 # 03 Y:1984 | 03 | 1984 | INSULATE BARE EQUIPMENT | $541 | $0 | Not Implemented |
TS0003 # 04 Y:1984 | 04 | 1984 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $11,700 | $25,770 | Not Implemented |
TS0003 # 05 Y:1984 | 05 | 1984 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,190 | $400 | Implemented |
TS0003 # 06 Y:1984 | 06 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,500 | $500 | Implemented |
CO0005 # 01 Y:1984 | 01 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,113 | $1,027 | Implemented |
CO0005 # 03 Y:1984 | 03 | 1984 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,622 | $5,000 | Not Implemented |
CO0005 # 04 Y:1984 | 04 | 1984 | INSULATE BARE EQUIPMENT | $202 | $250 | Not Implemented |
CO0005 # 05 Y:1984 | 05 | 1984 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $412 | $828 | Implemented |
CO0005 # 06 Y:1984 | 06 | 1984 | INSTALL TIMERS AND/OR THERMOSTATS | $2,026 | $130 | Implemented |
CO0005 # 07 Y:1984 | 07 | 1984 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $1,490 | $2,900 | Implemented |
CO0006 # 01 Y:1984 | 01 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $350 | $300 | Implemented |
CO0006 # 02 Y:1984 | 02 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $105 | $300 | Implemented |
CO0006 # 03 Y:1984 | 03 | 1984 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $356 | $20 | Implemented |