Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
163,737
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0195 # 07 Y:1986 | 07 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $964 | $600 | Implemented |
KU0195 # 08 Y:1986 | 08 | 1986 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $148 | $200 | Implemented |
KU0195 # 09 Y:1986 | 09 | 1986 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $124 | $200 | Implemented |
KU0195 # 10 Y:1986 | 10 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $229 | $0 | Implemented |
KU0195 # 11 Y:1986 | 11 | 1986 | INSTALL AUTOMATIC STACK DAMPER | $456 | $700 | Implemented |
KU0195 # 12 Y:1986 | 12 | 1986 | IMPROVE LUBRICATION PRACTICES | $495 | $200 | Implemented |
KU0195 # 13 Y:1986 | 13 | 1986 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $272 | $0 | Implemented |
KU0195 # 14 Y:1986 | 14 | 1986 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $122 | $0 | Not Implemented |
AT0037 # 01 Y:1986 | 01 | 1986 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,704 | $2,411 | Implemented |
AT0037 # 02 Y:1986 | 02 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $439 | $79 | Implemented |
AT0037 # 03 Y:1986 | 03 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,902 | $300 | Implemented |
AT0037 # 04 Y:1986 | 04 | 1986 | INCREASE AMOUNT OF CONDENSATE RETURNED | $3,940 | $5,000 | Implemented |
AT0037 # 05 Y:1986 | 05 | 1986 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $10,009 | $2,000 | Implemented |
UD0191 # 01 Y:1986 | 01 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,942 | $7,500 | Implemented |
UD0192 # 01 Y:1986 | 01 | 1986 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,234 | $2,500 | Implemented |
UD0192 # 02 Y:1986 | 02 | 1986 | REDUCE VENTILATION AIR | $4,173 | $2,500 | Implemented |
UD0193 # 01 Y:1986 | 01 | 1986 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $52,010 | $16,000 | Not Implemented |
UD0193 # 02 Y:1986 | 02 | 1986 | INSTALL STORM WINDOWS AND DOORS | $12,529 | $16,200 | Not Implemented |
UD0193 # 03 Y:1986 | 03 | 1986 | INSTALL SET-BACK TIMERS | $1,589 | $0 | Implemented |
UD0193 # 04 Y:1986 | 04 | 1986 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,168 | $0 | Implemented |
UD0193 # 05 Y:1986 | 05 | 1986 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $9,134 | $21,000 | Implemented |
UD0194 # 01 Y:1986 | 01 | 1986 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,611 | $12,000 | Implemented |
UD0194 # 02 Y:1986 | 02 | 1986 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $2,065 | $1,160 | Implemented |
UD0194 # 03 Y:1986 | 03 | 1986 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,063 | $1,000 | Implemented |
UD0194 # 04 Y:1986 | 04 | 1986 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $3,352 | $1,500 | Implemented |