IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

163,726

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0191 # 01 Y:1986 01 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $643 $0 Implemented
OK0191 # 02 Y:1986 02 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $721 $200 Implemented
OK0191 # 03 Y:1986 03 1986 INSULATE BARE EQUIPMENT $224 $92 Implemented
OK0191 # 04 Y:1986 04 1986 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $349 $510 Not Implemented
OK0191 # 05 Y:1986 05 1986 USE RADIANT HEATER FOR SPOT HEATING $2,051 $7,950 Not Implemented
OK0192 # 01 Y:1986 01 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,426 $9,484 Not Implemented
OK0192 # 02 Y:1986 02 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,006 $1,225 Not Implemented
OK0192 # 03 Y:1986 03 1986 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,057 $3,500 Implemented
OK0192 # 04 Y:1986 04 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,945 $7,768 Not Implemented
OK0192 # 05 Y:1986 05 1986 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $11,547 $32,800 Implemented
OK0192 # 06 Y:1986 06 1986 BURN WASTE OIL FOR HEAT $3,391 $2,400 Not Implemented
OK0192 # 07 Y:1986 07 1986 RECOVER AND REUSE COOLING WATER $96,689 $52,800 Implemented
KU0192 # 01 Y:1986 01 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,354 $200 Implemented
KU0192 # 02 Y:1986 02 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,299 $6,408 Implemented
KU0192 # 03 Y:1986 03 1986 AIR CONDITION ONLY SPACE NECESSARY $2,153 $1,032 Not Implemented
KU0192 # 04 Y:1986 04 1986 INSTALL AUTOMATIC STACK DAMPER $1,847 $1,900 Not Implemented
KU0192 # 05 Y:1986 05 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $816 $0 Not Implemented
KU0192 # 06 Y:1986 06 1986 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,390 $100 Not Implemented
KU0192 # 07 Y:1986 07 1986 IMPROVE LUBRICATION PRACTICES $2,627 $1,700 Not Implemented
KU0192 # 08 Y:1986 08 1986 INSULATE BARE EQUIPMENT $293 $200 Implemented
KU0192 # 09 Y:1986 09 1986 INSULATE BARE EQUIPMENT $261 $300 Implemented
KU0192 # 10 Y:1986 10 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $237 $0 Not Implemented
KU0193 # 01 Y:1986 01 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,876 $5,003 Implemented
KU0193 # 02 Y:1986 02 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $769 $100 Implemented
KU0193 # 03 Y:1986 03 1986 INSTALL TIMERS AND/OR THERMOSTATS $4,524 $667 Implemented