Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,969
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0462 # 01 Y:2000 | 01 | 2000 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $961,067 | $880,000 | Not Implemented |
MA0462 # 02 Y:2000 | 02 | 2000 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $194,677 | $430,350 | Not Implemented |
MA0462 # 03 Y:2000 | 03 | 2000 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $113,014 | $750,000 | Not Implemented |
MA0462 # 04 Y:2000 | 04 | 2000 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $14,632 | $31,000 | Implemented |
MA0462 # 05 Y:2000 | 05 | 2000 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $13,500 | $6,000 | Implemented |
MA0462 # 06 Y:2000 | 06 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,580 | $17,000 | Implemented |
MA0462 # 07 Y:2000 | 07 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,757 | $1,200 | Implemented |
MA0462 # 08 Y:2000 | 08 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,467 | $14,000 | Not Implemented |
MA0462 # 09 Y:2000 | 09 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,406 | $1,200 | Implemented |
MA0462 # 10 Y:2000 | 10 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $614 | $3,575 | Implemented |
MA0461 # 01 Y:2000 | 01 | 2000 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $15,869 | $768 | Implemented |
MA0461 # 02 Y:2000 | 02 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $6,834 | $18,630 | Implemented |
MA0461 # 03 Y:2000 | 03 | 2000 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $4,117 | $128,000 | Not Implemented |
MA0461 # 04 Y:2000 | 04 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,838 | $30,000 | Implemented |
MA0461 # 05 Y:2000 | 05 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,501 | $1,630 | Implemented |
MA0461 # 06 Y:2000 | 06 | 2000 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,272 | $0 | Implemented |
MA0461 # 07 Y:2000 | 07 | 2000 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $848 | $0 | Implemented |
MA0459 # 01 Y:2000 | 01 | 2000 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $2,945 | $7,695 | Not Implemented |
MA0459 # 02 Y:2000 | 02 | 2000 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,064 | $150 | Implemented |
MA0459 # 03 Y:2000 | 03 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $789 | $150 | Implemented |
MA0459 # 04 Y:2000 | 04 | 2000 | OPTIMIZE PLANT POWER FACTOR | $557 | $1,275 | Not Implemented |
MA0459 # 05 Y:2000 | 05 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $266 | $1,250 | Not Implemented |
MA0459 # 06 Y:2000 | 06 | 2000 | INSTALL OCCUPANCY SENSORS | $55 | $248 | Implemented |
MA0456 # 01 Y:2000 | 01 | 2000 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $298,233 | $84,000 | Not Implemented |
MA0456 # 02 Y:2000 | 02 | 2000 | USE STEAM PRESSURE REDUCTION TO GENERATE POWER | $127,075 | $218,000 | Not Implemented |