IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,394

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0562 # 03 Y:2004 03 2004 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,445 $650 Implemented
MA0562 # 04 Y:2004 04 2004 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $2,903 $0 Not Implemented
MA0562 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,626 $250 Implemented
MA0562 # 06 Y:2004 06 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $820 $1,640 Not Implemented
MA0562 # 07 Y:2004 07 2004 INSTALL OCCUPANCY SENSORS $361 $512 Implemented
OK0693 # 01 Y:2004 01 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $585,281 $30,200 Not Implemented
OK0693 # 02 Y:2004 02 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $28,651 $88,297 Not Implemented
OK0693 # 03 Y:2004 03 2004 OPTIMIZE PLANT POWER FACTOR $7,010 $10,720 n/a
OK0693 # 04 Y:2004 04 2004 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $2,179 $3,635 Not Implemented
OK0693 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,903 $31,913 Implemented
OK0693 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $808 $123 Not Implemented
OK0693 # 07 Y:2004 07 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $992 $1,025 Not Implemented
OK0693 # 08 Y:2004 08 2004 INSTALL TIMERS AND/OR THERMOSTATS $772 $1,140 Implemented
OK0693 # 09 Y:2004 09 2004 INSTALL OCCUPANCY SENSORS $356 $737 Implemented
UD0703 # 01 Y:2004 01 2004 REDUCE SCRAP PRODUCTION $45,630 $650 Implemented
UD0703 # 02 Y:2004 02 2004 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $5,110 $0 Implemented
UD0703 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,733 $5,215 Not Implemented
UD0703 # 04 Y:2004 04 2004 REDUCE OR ELIMINATE WASTE $1,365 $1,960 Implemented
UD0703 # 05 Y:2004 05 2004 $1,200 $0 Not Implemented
UD0703 # 06 Y:2004 06 2004 DISCONNECT BALLASTS $762 $235 Not Implemented
UD0703 # 07 Y:2004 07 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $520 $0 Not Implemented
UD0703 # 08 Y:2004 08 2004 DISCONNECT BALLASTS $392 $206 Implemented
UD0703 # 09 Y:2004 09 2004 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $356 $522 Not Implemented
UD0703 # 10 Y:2004 10 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $289 $126 Implemented
AS0387 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,518 $500 Not Implemented