IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,756

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0517 # 03 Y:2018 03 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $20,334 $78,376 Implemented
UF0517 # 04 Y:2018 04 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $21,928 $0 Implemented
UF0517 # 05 Y:2018 05 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,845 $9,000 Implemented
UF0517 # 06 Y:2018 06 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $8,963 $0 Implemented
NC0611 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $58,179 $92,653 Implemented
NC0611 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,370 $200 Implemented
NC0611 # 03 Y:2018 03 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,064 $100 Not Implemented
NC0611 # 04 Y:2018 04 2018 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $7,227 $35,000 Not Implemented
NC0611 # 05 Y:2018 05 2018 DEVELOP A REPAIR/REPLACE POLICY $2,887 $5,685 Implemented
NC0611 # 06 Y:2018 06 2018 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,662 $200 Implemented
UA0194 # 01 Y:2018 01 2018 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $53,942 $257,046 Not Implemented
UA0194 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $22,431 $9,390 Implemented
UA0194 # 03 Y:2018 03 2018 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $65,495 $71,371 Not Implemented
UA0194 # 04 Y:2018 04 2018 INSTALL TIMERS AND/OR THERMOSTATS $22,999 $0 Implemented
UA0194 # 05 Y:2018 05 2018 REPLACE BOILER $41,312 $190,000 Not Implemented
UA0194 # 06 Y:2018 06 2018 INSULATE BARE EQUIPMENT $380 $1,205 Implemented
UA0194 # 07 Y:2018 07 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $18,351 $7,494 Not Implemented
NC0610 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,309 $135,942 Implemented
NC0610 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,172 $200 Implemented
NC0610 # 03 Y:2018 03 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,006 $1,350 Not Implemented
NC0610 # 04 Y:2018 04 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $981 $100 Not Implemented
NC0610 # 05 Y:2018 05 2018 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $4,293 $10,000 Implemented
NC0610 # 06 Y:2018 06 2018 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $9,484 $10,000 Implemented
NC0610 # 07 Y:2018 07 2018 DEVELOP A REPAIR/REPLACE POLICY $1,934 $5,865 Implemented
TR0009 # 01 Y:2018 01 2018 OPTIMIZE PLANT POWER FACTOR $3,043 $12,500 Not Implemented