IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

161,963

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0120 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,272 $2,159 Implemented
KU0120 # 02 Y:1984 02 1984 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD $2,048 $200 Not Implemented
KU0120 # 03 Y:1984 03 1984 IMPROVE LUBRICATION PRACTICES $1,536 $215 Not Implemented
KU0120 # 04 Y:1984 04 1984 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $917 $0 Implemented
KU0120 # 05 Y:1984 05 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,077 $70 Implemented
KU0120 # 06 Y:1984 06 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $519 $240 Not Implemented
KU0120 # 07 Y:1984 07 1984 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $479 $0 Not Implemented
KU0120 # 08 Y:1984 08 1984 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $249 $0 Implemented
KU0120 # 09 Y:1984 09 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $259 $358 Not Implemented
KU0120 # 10 Y:1984 10 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $127 $0 Not Implemented
UD0117 # 01 Y:1984 01 1984 REDESIGN PROCESS $9,920 $18,000 Not Implemented
UD0117 # 02 Y:1984 02 1984 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,837 $2,000 Not Implemented
UD0117 # 03 Y:1984 03 1984 INSTALL STORM WINDOWS AND DOORS $18,493 $22,385 Implemented
UD0117 # 04 Y:1984 04 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,694 $0 Implemented
UD0117 # 05 Y:1984 05 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $548 $182 Implemented
UD0118 # 01 Y:1984 01 1984 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,495 $0 Implemented
UD0118 # 02 Y:1984 02 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,336 $335 Implemented
UD0118 # 03 Y:1984 03 1984 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $3,044 $0 Not Implemented
UD0118 # 04 Y:1984 04 1984 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $24,598 $126,000 Not Implemented
UD0119 # 01 Y:1984 01 1984 REVISE SMOKE CLEANUP FROM OPERATIONS $5,989 $1,000 Implemented
UD0119 # 02 Y:1984 02 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,135 $700 Implemented
UD0119 # 03 Y:1984 03 1984 REDESIGN PROCESS $683 $2,000 Implemented
UD0119 # 04 Y:1984 04 1984 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $162 $700 Implemented
UD0120 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,558 $83,000 Implemented
TN0200 # 01 Y:1984 01 1984 INSTALL TIMERS AND/OR THERMOSTATS $2,865 $3,200 Not Implemented