IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

161,963

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0126 # 05 Y:1984 05 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,231 $1,913 Implemented
OK0126 # 09 Y:1984 09 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,416 $704 Implemented
OK0126 # 13 Y:1984 13 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $123 $36 Implemented
OK0133 # 01 Y:1984 01 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $86,486 $28,000 Implemented
OK0133 # 02 Y:1984 02 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,495 $450 Not Implemented
OK0133 # 03 Y:1984 03 1984 TURN OFF EQUIPMENT WHEN NOT IN USE $11,684 $816 Implemented
OK0133 # 04 Y:1984 04 1984 INSULATE BARE EQUIPMENT $4,213 $5,058 Not Implemented
OK0133 # 05 Y:1984 05 1984 INSULATE BARE EQUIPMENT $15 $33 Implemented
OK0133 # 06 Y:1984 06 1984 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $181 $0 Not Implemented
OK0133 # 07 Y:1984 07 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $38 $25 Implemented
OK0133 # 08 Y:1984 08 1984 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $56,217 $125,000 Not Implemented
OK0133 # 09 Y:1984 09 1984 INSTALL TIMERS AND/OR THERMOSTATS $98 $500 Implemented
UD0113 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,926 $62,859 Implemented
UD0113 # 02 Y:1984 02 1984 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $15,633 $4,906 Implemented
UD0113 # 03 Y:1984 03 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,847 $0 Implemented
UD0113 # 04 Y:1984 04 1984 INSULATE BARE EQUIPMENT $608 $200 Implemented
UD0113 # 05 Y:1984 05 1984 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $13,999 $30,000 Implemented
UD0115 # 01 Y:1984 01 1984 INSTALL STORM WINDOWS AND DOORS $30,317 $42,568 Implemented
UD0115 # 02 Y:1984 02 1984 USE OPTIMUM TEMPERATURE $662 $1,000 Implemented
UD0115 # 03 Y:1984 03 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,093 $239 Implemented
UD0115 # 04 Y:1984 04 1984 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $1,013 $3,000 Not Implemented
UD0115 # 05 Y:1984 05 1984 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $5,490 $35,000 Not Implemented
UD0115 # 06 Y:1984 06 1984 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $1,350 $4,000 Not Implemented
GT0206 # 01 Y:1984 01 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,815 $200 Implemented
GT0206 # 02 Y:1984 02 1984 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $8,580 $4,500 Implemented