IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

161,963

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0112 # 09 Y:1984 09 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $625 $300 Not Implemented
KU0113 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,125 $5,708 Not Implemented
KU0113 # 02 Y:1984 02 1984 INSTALL TURBULATORS $558 $1,100 Not Implemented
KU0113 # 03 Y:1984 03 1984 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $523 $1,010 Implemented
KU0113 # 04 Y:1984 04 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $431 $200 Implemented
KU0113 # 05 Y:1984 05 1984 INSTALL AUTOMATIC STACK DAMPER $120 $160 Implemented
KU0113 # 06 Y:1984 06 1984 INSTALL TIMERS AND/OR THERMOSTATS $112 $100 Not Implemented
TN0198 # 01 Y:1984 01 1984 INSULATE BARE EQUIPMENT $3,850 $2,583 Implemented
TN0198 # 02 Y:1984 02 1984 INSTALL / REPAIR INSULATION ON STEAM LINES $442 $589 Implemented
TN0198 # 03 Y:1984 03 1984 USE MINIMUM STEAM OPERATING PRESSURE $257 $0 Implemented
TN0198 # 04 Y:1984 04 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $0 $108 Implemented
TN0198 # 05 Y:1984 05 1984 REPAIR AND ELIMINATE STEAM LEAKS $168 $183 Implemented
TN0199 # 01 Y:1984 01 1984 HEAT WATER WITH EXHAUST HEAT $3,718 $10,800 Implemented
TN0199 # 02 Y:1984 02 1984 AIR CONDITION ONLY SPACE NECESSARY $1,733 $0 Implemented
TN0199 # 03 Y:1984 03 1984 INSTALL TIMERS AND/OR THERMOSTATS $5,890 $800 Implemented
UD0112 # 01 Y:1984 01 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,036 $800 Implemented
UD0112 # 02 Y:1984 02 1984 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $18,921 $21,000 Implemented
UD0112 # 03 Y:1984 03 1984 REDESIGN PROCESS $4,152 $1,200 Not Implemented
UD0112 # 04 Y:1984 04 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,427 $8,505 Implemented
UD0112 # 05 Y:1984 05 1984 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $6,913 $5,000 Implemented
UD0112 # 06 Y:1984 06 1984 INSTALL TIMERS AND/OR THERMOSTATS $5,475 $1,160 Not Implemented
OK0113 # 01 Y:1984 01 1984 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $304 $280 Not Implemented
OK0113 # 02 Y:1984 02 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $198 $235 Implemented
OK0113 # 03 Y:1984 03 1984 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $680 $80 Not Implemented
OK0114 # 01 Y:1984 01 1984 OPTIMIZE PLANT POWER FACTOR $12,995 $27,645 Implemented