IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

161,963

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0118 # 05 Y:1984 05 1984 PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT $90 $208 Not Implemented
OK0118 # 06 Y:1984 06 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $51 $53 Not Implemented
OK0118 # 07 Y:1984 07 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $88 $27 Not Implemented
OK0120 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $397 $89 Not Implemented
OK0120 # 02 Y:1984 02 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $91 $0 Implemented
OK0120 # 03 Y:1984 03 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $335 $0 Implemented
UD0107 # 01 Y:1983 01 1983 INSTALL TIMERS AND/OR THERMOSTATS $1,233 $750 Not Implemented
UD0107 # 02 Y:1983 02 1983 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,281 $487 Implemented
UD0107 # 03 Y:1983 03 1983 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $873 $600 Not Implemented
UD0107 # 04 Y:1983 04 1983 INSTALL STORM WINDOWS AND DOORS $668 $182 Not Implemented
UD0108 # 01 Y:1983 01 1983 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $1,118 $1,300 Implemented
UD0108 # 02 Y:1983 02 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,511 $2,000 Implemented
UD0108 # 03 Y:1983 03 1983 INSTALL TIMERS AND/OR THERMOSTATS $5,030 $4,000 Implemented
UD0109 # 01 Y:1983 01 1983 INSTALL / REPAIR INSULATION ON STEAM LINES $4,597 $980 Implemented
UD0109 # 02 Y:1983 02 1983 INSULATE BARE EQUIPMENT $9,554 $600 Implemented
UD0109 # 03 Y:1983 03 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $12,630 $800 Implemented
UD0109 # 04 Y:1983 04 1983 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $16,051 $40,000 Implemented
UD0109 # 05 Y:1983 05 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,827 $6,843 Implemented
UD0109 # 06 Y:1983 06 1983 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $15,968 $61,880 Not Implemented
UD0109 # 07 Y:1983 07 1983 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $6,651 $5,475 Implemented
UD0110 # 02 Y:1983 02 1983 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $18,169 $48,000 Not Implemented
UD0110 # 03 Y:1983 03 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $933 $0 Not Implemented
UD0110 # 04 Y:1983 04 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,620 $682 Not Implemented
UD0110 # 05 Y:1983 05 1983 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $13,804 $30,000 Not Implemented
UD0111 # 01 Y:1983 01 1983 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $992 $600 Implemented