IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,193

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0343 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,390 $5,864 Not Implemented
UM0343 # 06 Y:2008 06 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,378 $750 Implemented
UM0342 # 01 Y:2008 01 2008 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $9,661 $7,350 Not Implemented
UM0342 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,313 $7,500 Implemented
UM0342 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,736 $13,776 Not Implemented
UM0342 # 04 Y:2008 04 2008 REDUCE VENTILATION AIR $2,824 $1,228 Not Implemented
UM0342 # 05 Y:2008 05 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,462 $515 Not Implemented
UM0342 # 06 Y:2008 06 2008 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,437 $0 Not Implemented
UM0342 # 07 Y:2008 07 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $798 $638 Implemented
UM0341 # 01 Y:2008 01 2008 INSULATE BARE EQUIPMENT $101,548 $18,088 Not Implemented
UM0341 # 02 Y:2008 02 2008 INSULATE BARE EQUIPMENT $79,804 $53,414 Implemented
UM0341 # 03 Y:2008 03 2008 RECOVER WASTE HEAT FROM EQUIPMENT $31,965 $59,142 Not Implemented
UM0341 # 04 Y:2008 04 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,835 $4,800 Not Implemented
UM0341 # 05 Y:2008 05 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,572 $5,000 Not Implemented
UM0341 # 06 Y:2008 06 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,111 $8,160 Not Implemented
UM0341 # 07 Y:2008 07 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,356 $515 Not Implemented
UM0340 # 01 Y:2008 01 2008 OPTIMIZE PLANT POWER FACTOR $15,424 $32,000 Implemented
UM0340 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $490 $447 Not Implemented
UM0340 # 03 Y:2008 03 2008 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $439 $250 Not Implemented
UM0340 # 04 Y:2008 04 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $329 $500 Implemented
UM0339 # 01 Y:2008 01 2008 USE OPTIMUM TEMPERATURE $136,461 $172,800 Not Implemented
UM0339 # 02 Y:2008 02 2008 REPAIR AND ELIMINATE STEAM LEAKS $108,562 $15,000 Not Implemented
UM0339 # 03 Y:2008 03 2008 BURN WASTE OIL FOR HEAT $42,258 $4,000 Not Implemented
UM0339 # 04 Y:2008 04 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $25,917 $2,600 Not Implemented
UM0339 # 05 Y:2008 05 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $15,086 $2,540 Not Implemented