Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,642
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0069 # 07 Y:2011 | 07 | 2011 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $36,400 | $0 | Implemented |
MZ0069 # 08 Y:2011 | 08 | 2011 | INSTALL OCCUPANCY SENSORS | $630 | $250 | Implemented |
MZ0069 # 09 Y:2011 | 09 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $940 | $2,600 | Implemented |
MZ0069 # 10 Y:2011 | 10 | 2011 | CONSIDER INTERMEDIATE OR ECONOMY SIZE AUTOS / TRUCKS | $65,000 | $85,000 | Not Implemented |
MZ0069 # 11 Y:2011 | 11 | 2011 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $120,000 | $150,000 | Not Implemented |
MZ0069 # 12 Y:2011 | 12 | 2011 | USE PLASTIC PALLETS INSTEAD OF WOOD | $25,000 | $5,000 | Not Implemented |
MZ0069 # 13 Y:2011 | 13 | 2011 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $35,000 | $8,500 | Not Implemented |
MZ0069 # 14 Y:2011 | 14 | 2011 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $115,000 | $12,500 | Not Implemented |
MZ0069 # 15 Y:2011 | 15 | 2011 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $115,000 | $125,000 | Implemented |
MZ0071 # 01 Y:2011 | 01 | 2011 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $15,644 | $3,400 | Not Implemented |
MZ0071 # 02 Y:2011 | 02 | 2011 | INSTALL OCCUPANCY SENSORS | $285 | $610 | Implemented |
MZ0071 # 03 Y:2011 | 03 | 2011 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $429 | $0 | Implemented |
MZ0071 # 04 Y:2011 | 04 | 2011 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $19,137 | $1,000 | Implemented |
MZ0071 # 05 Y:2011 | 05 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,810 | $1,300 | Implemented |
MZ0071 # 06 Y:2011 | 06 | 2011 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $7,545 | $1,133 | Not Implemented |
MZ0071 # 07 Y:2011 | 07 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,223 | $800 | Implemented |
MZ0071 # 08 Y:2011 | 08 | 2011 | TURN OFF EQUIPMENT WHEN NOT IN USE | $35 | $50 | Implemented |
MZ0071 # 09 Y:2011 | 09 | 2011 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,831 | $0 | Implemented |
MZ0071 # 10 Y:2011 | 10 | 2011 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $3,736 | $6,494 | Implemented |
MZ0070 # 01 Y:2011 | 01 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,076 | $800 | Implemented |
MZ0070 # 02 Y:2011 | 02 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,693 | $920 | Implemented |
MZ0070 # 03 Y:2011 | 03 | 2011 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,071 | $1,122 | Implemented |
MZ0070 # 04 Y:2011 | 04 | 2011 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $2,769 | $360 | Implemented |
MZ0070 # 05 Y:2011 | 05 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $40,140 | $10,000 | Implemented |
MZ0070 # 06 Y:2011 | 06 | 2011 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $209 | $200 | Not Implemented |