Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,754
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0757 # 02 Y:2008 | 02 | 2008 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $14,252 | $7,032 | Not Implemented |
OK0757 # 03 Y:2008 | 03 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,400 | $39,500 | Not Implemented |
OK0757 # 04 Y:2008 | 04 | 2008 | APPLY FOR INVESTMENT INCENTIVES | $9,419 | $0 | Not Implemented |
OK0757 # 05 Y:2008 | 05 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,133 | $4,638 | Not Implemented |
OK0757 # 06 Y:2008 | 06 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $958 | $1,214 | Not Implemented |
OK0750 # 01 Y:2007 | 01 | 2007 | INSTALL TIMERS AND/OR THERMOSTATS | $6,319 | $1,100 | Not Implemented |
OK0750 # 02 Y:2007 | 02 | 2007 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $1,776 | $8,988 | Not Implemented |
OK0750 # 03 Y:2007 | 03 | 2007 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $1,091 | $4,248 | Not Implemented |
OK0750 # 04 Y:2007 | 04 | 2007 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $8,272 | $16,000 | Not Implemented |
OK0750 # 05 Y:2007 | 05 | 2007 | INSTALL SKYLIGHTS | $5,428 | $33,634 | Not Implemented |
OK0750 # 06 Y:2007 | 06 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,311 | $7,391 | Not Implemented |
OK0750 # 07 Y:2007 | 07 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,081 | $5,998 | Not Implemented |
OK0750 # 08 Y:2007 | 08 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,525 | $1,000 | Not Implemented |
OK0750 # 09 Y:2007 | 09 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,287 | $6,522 | Not Implemented |
OK0750 # 10 Y:2007 | 10 | 2007 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $4,150,588 | $195,000 | Not Implemented |
OK0749 # 01 Y:2007 | 01 | 2007 | MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT | $74,106 | $206,725 | Not Implemented |
OK0749 # 02 Y:2007 | 02 | 2007 | REDUCE EXCESSIVE BOILER BLOWDOWN | $66,275 | $21,000 | Not Implemented |
OK0749 # 03 Y:2007 | 03 | 2007 | INSTALL / REPAIR INSULATION ON STEAM LINES | $126,819 | $38,280 | Not Implemented |
OK0749 # 04 Y:2007 | 04 | 2007 | REPAIR AND ELIMINATE STEAM LEAKS | $93,609 | $4,680 | Not Implemented |
OK0749 # 05 Y:2007 | 05 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,286 | $1,985 | Not Implemented |
OK0749 # 06 Y:2007 | 06 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,461 | $0 | Implemented |
OK0749 # 07 Y:2007 | 07 | 2007 | INCREASE AMOUNT OF CONDENSATE RETURNED | $181,080 | $110,352 | Not Implemented |
OK0749 # 08 Y:2007 | 08 | 2007 | OPERATE BOILERS ON HIGH FIRE SETTING | $238,762 | $50,000 | Not Implemented |
OK0747 # 01 Y:2007 | 01 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,165 | $4,559 | Implemented |
OK0747 # 02 Y:2007 | 02 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $991 | $326 | Not Implemented |