IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,767

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0060 # 10 Y:2011 10 2011 INSTALL TIMERS AND/OR THERMOSTATS $3,700 $1,600 Not Implemented
TT0060 # 11 Y:2011 11 2011 INSTALL TIMERS AND/OR THERMOSTATS $500 $600 Not Implemented
TT0060 # 12 Y:2011 12 2011 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,280 $0 Not Implemented
TT0059 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,600 $38,200 Implemented
TT0059 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $38,100 $205,600 Implemented
TT0059 # 03 Y:2011 03 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,900 $1,800 Implemented
TT0059 # 04 Y:2011 04 2011 RECOVER WASTE HEAT FROM EQUIPMENT $6,500 $7,500 Not Implemented
TT0059 # 05 Y:2011 05 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,900 $4,900 Not Implemented
TT0059 # 06 Y:2011 06 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,400 $5 Implemented
TT0052 # 01 Y:2010 01 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,444 $3,000 Implemented
TT0052 # 02 Y:2010 02 2010 RECOVER WASTE HEAT FROM EQUIPMENT $4,100 $7,000 Not Implemented
TT0052 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,000 $15,450 Not Implemented
TT0052 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,700 $15,000 Not Implemented
TT0051 # 01 Y:2010 01 2010 OPTIMIZE PLANT POWER FACTOR $30,200 $50,000 Not Implemented
TT0051 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,895 $4,900 Not Implemented
TT0051 # 03 Y:2010 03 2010 INSTALL OCCUPANCY SENSORS $8,500 $15,750 Not Implemented
TT0051 # 04 Y:2010 04 2010 INSTALL OCCUPANCY SENSORS $1,300 $2,800 Not Implemented
TT0058 # 01 Y:2010 01 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,559 $10,900 Not Implemented
TT0058 # 02 Y:2010 02 2010 INSTALL SKYLIGHTS $7,020 $12,100 Not Implemented
TT0058 # 03 Y:2010 03 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,034 $0 Implemented
TT0058 # 04 Y:2010 04 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $584 $850 Implemented
TT0056 # 01 Y:2010 01 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,872 $11,208 Not Implemented
TT0056 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,661 $45,225 Not Implemented
TT0056 # 03 Y:2010 03 2010 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $8,445 $1,444 Not Implemented
TT0056 # 04 Y:2010 04 2010 INSTALL SKYLIGHTS $16,932 $88,000 Not Implemented