Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
161,963
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0089 # 02 Y:1983 | 02 | 1983 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $12,879 | $30,000 | Implemented |
UD0089 # 03 Y:1983 | 03 | 1983 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,029 | $408 | Not Implemented |
GT0182 # 01 Y:1983 | 01 | 1983 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,190 | $800 | Not Implemented |
GT0182 # 02 Y:1983 | 02 | 1983 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $910 | $1,000 | Not Implemented |
GT0182 # 03 Y:1983 | 03 | 1983 | ISOLATE HOT OR COLD EQUIPMENT | $2,780 | $1,520 | Not Implemented |
GT0182 # 04 Y:1983 | 04 | 1983 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,200 | $7,000 | Not Implemented |
GT0182 # 05 Y:1983 | 05 | 1983 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,230 | $8,940 | Not Implemented |
GT0183 # 01 Y:1983 | 01 | 1983 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,660 | $200 | Implemented |
GT0183 # 02 Y:1983 | 02 | 1983 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,680 | $11,600 | Implemented |
GT0183 # 03 Y:1983 | 03 | 1983 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,850 | $9,000 | Implemented |
GT0183 # 04 Y:1983 | 04 | 1983 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $330 | $0 | Not Implemented |
GT0183 # 05 Y:1983 | 05 | 1983 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $4,100 | $5,290 | Not Implemented |
GT0183 # 06 Y:1983 | 06 | 1983 | ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE | $580 | $360 | Implemented |
GT0183 # 07 Y:1983 | 07 | 1983 | INSTALL TIMERS AND/OR THERMOSTATS | $2,200 | $909 | Implemented |
GT0185 # 01 Y:1983 | 01 | 1983 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $9,050 | $1,200 | Not Implemented |
GT0185 # 02 Y:1983 | 02 | 1983 | MINIMIZE WATER USAGE | $8,324 | $3,000 | Not Implemented |
GT0185 # 03 Y:1983 | 03 | 1983 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,683 | $4,700 | Not Implemented |
GT0185 # 04 Y:1983 | 04 | 1983 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $11,993 | $9,000 | Not Implemented |
GT0185 # 05 Y:1983 | 05 | 1983 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $21,913 | $97,700 | Not Implemented |
GT0185 # 06 Y:1983 | 06 | 1983 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,729 | $0 | Not Implemented |
GT0185 # 07 Y:1983 | 07 | 1983 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $11,340 | $9,000 | Not Implemented |
GT0185 # 08 Y:1983 | 08 | 1983 | USE OPTIMUM THICKNESS INSULATION | $9,548 | $8,200 | Not Implemented |
OK0087 # 01 Y:1983 | 01 | 1983 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $118 | $120 | Not Implemented |
OK0087 # 02 Y:1983 | 02 | 1983 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $42 | $0 | Not Implemented |
OK0087 # 03 Y:1983 | 03 | 1983 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,133 | $250 | Implemented |