Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
160,834
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0046 # 02 Y:1982 | 02 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $831 | $1,852 | Implemented |
KU0046 # 03 Y:1982 | 03 | 1982 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $266 | $393 | Implemented |
KU0046 # 04 Y:1982 | 04 | 1982 | PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT | $260 | $480 | Implemented |
KU0046 # 05 Y:1982 | 05 | 1982 | INSTALL STORM WINDOWS AND DOORS | $51 | $286 | Implemented |
KU0047 # 01 Y:1982 | 01 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,357 | $700 | Not Implemented |
KU0047 # 02 Y:1982 | 02 | 1982 | REDESIGN PROCESS | $18,787 | $112,000 | Not Implemented |
KU0047 # 03 Y:1982 | 03 | 1982 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $6,266 | $2,500 | Not Implemented |
KU0047 # 04 Y:1982 | 04 | 1982 | INSTALL TIMERS AND/OR THERMOSTATS | $27,712 | $215 | Not Implemented |
KU0047 # 05 Y:1982 | 05 | 1982 | INSTALL AUTOMATIC STACK DAMPER | $6,768 | $3,500 | Implemented |
KU0047 # 06 Y:1982 | 06 | 1982 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,948 | $370 | Not Implemented |
KU0047 # 07 Y:1982 | 07 | 1982 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,115 | $1,000 | Not Implemented |
KU0048 # 01 Y:1982 | 01 | 1982 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $29,754 | $15,000 | Implemented |
KU0048 # 02 Y:1982 | 02 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,256 | $5,941 | Implemented |
KU0048 # 03 Y:1982 | 03 | 1982 | INSULATE BARE EQUIPMENT | $8,484 | $21,600 | Not Implemented |
KU0048 # 04 Y:1982 | 04 | 1982 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $13,580 | $1,400 | Implemented |
KU0048 # 05 Y:1982 | 05 | 1982 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $13,088 | $13,000 | Implemented |
KU0048 # 06 Y:1982 | 06 | 1982 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $9,296 | $1,500 | Not Implemented |
KU0049 # 01 Y:1982 | 01 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,612 | $3,222 | Not Implemented |
KU0049 # 02 Y:1982 | 02 | 1982 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $42,700 | $0 | Not Implemented |
KU0049 # 03 Y:1982 | 03 | 1982 | USE WATER ON AIR CONDITIONING EXCHANGER TO IMPROVE HEAT TRANSFER AND INCREASE AIR CONDITIONER EFFICIENCY | $6,750 | $6,900 | Not Implemented |
KU0049 # 04 Y:1982 | 04 | 1982 | INSTALL AUTOMATIC STACK DAMPER | $399 | $65 | Not Implemented |
KU0049 # 05 Y:1982 | 05 | 1982 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $70 | $60 | Not Implemented |
KU0050 # 01 Y:1982 | 01 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,836 | $4,009 | Implemented |
KU0050 # 02 Y:1982 | 02 | 1982 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $118,344 | $10,000 | Implemented |
KU0050 # 03 Y:1982 | 03 | 1982 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,013 | $1,000 | Implemented |