Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
161,963
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0171 # 06 Y:1983 | 06 | 1983 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $5,660 | $3,000 | Not Implemented |
GT0171 # 07 Y:1983 | 07 | 1983 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $613 | $2,470 | Not Implemented |
GT0172 # 01 Y:1983 | 01 | 1983 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,800 | $4,200 | Not Implemented |
GT0172 # 02 Y:1983 | 02 | 1983 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $19,986 | $16,501 | Not Implemented |
GT0172 # 03 Y:1983 | 03 | 1983 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,833 | $3,640 | Not Implemented |
GT0172 # 04 Y:1983 | 04 | 1983 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,222 | $500 | Not Implemented |
KU0083 # 06 Y:1983 | 06 | 1983 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,388 | $1,000 | Not Implemented |
KU0083 # 07 Y:1983 | 07 | 1983 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,095 | $500 | Not Implemented |
KU0083 # 08 Y:1983 | 08 | 1983 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $286 | $250 | Not Implemented |
KU0084 # 01 Y:1983 | 01 | 1983 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,386 | $127 | Not Implemented |
KU0084 # 02 Y:1983 | 02 | 1983 | INSTALL TIMERS AND/OR THERMOSTATS | $3,551 | $1,400 | Not Implemented |
KU0084 # 03 Y:1983 | 03 | 1983 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $877 | $155 | Implemented |
KU0084 # 04 Y:1983 | 04 | 1983 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $167 | $160 | Implemented |
KU0084 # 05 Y:1983 | 05 | 1983 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $135 | $0 | Not Implemented |
KU0084 # 06 Y:1983 | 06 | 1983 | INSTALL AUTOMATIC STACK DAMPER | $84 | $144 | Not Implemented |
KU0085 # 01 Y:1983 | 01 | 1983 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,553 | $21,306 | Implemented |
KU0085 # 02 Y:1983 | 02 | 1983 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $14,849 | $9,478 | Implemented |
KU0085 # 03 Y:1983 | 03 | 1983 | INSTALL TIMERS AND/OR THERMOSTATS | $7,806 | $4,800 | Implemented |
KU0085 # 04 Y:1983 | 04 | 1983 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $13,011 | $11,400 | Implemented |
KU0085 # 05 Y:1983 | 05 | 1983 | INSTALL / REPAIR INSULATION ON STEAM LINES | $105,477 | $25,000 | Implemented |
KU0085 # 06 Y:1983 | 06 | 1983 | INSULATE BARE EQUIPMENT | $2,958 | $4,861 | Implemented |
KU0085 # 07 Y:1983 | 07 | 1983 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $51,359 | $2,500 | Implemented |
KU0085 # 08 Y:1983 | 08 | 1983 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $6,788 | $10,000 | Not Implemented |
KU0085 # 09 Y:1983 | 09 | 1983 | USE MINIMUM STEAM OPERATING PRESSURE | $5,708 | $0 | Not Implemented |
KU0080 # 01 Y:1983 | 01 | 1983 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,124 | $2,024 | Not Implemented |