IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

161,963

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0083 # 04 Y:1983 04 1983 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,097 $200 Implemented
OK0083 # 05 Y:1983 05 1983 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $323 $730 Implemented
OK0083 # 06 Y:1983 06 1983 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $454 $130 Implemented
OK0083 # 07 Y:1983 07 1983 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $16,433 $34,221 Implemented
OK0083 # 08 Y:1983 08 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $469 $127 Implemented
UD0075 # 01 Y:1983 01 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,287 $562 Not Implemented
UD0075 # 02 Y:1983 02 1983 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE $41,500 $80,000 Not Implemented
UD0075 # 03 Y:1983 03 1983 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,692 $0 Not Implemented
UD0075 # 04 Y:1983 04 1983 REPLACE WATER COOLING ON PROCESSES WITH AIR COOLING $4,855 $17,600 Not Implemented
UD0075 # 05 Y:1983 05 1983 TURN OFF EQUIPMENT WHEN NOT IN USE $4,046 $33,000 Not Implemented
UD0075 # 06 Y:1983 06 1983 TURN OFF EQUIPMENT WHEN NOT IN USE $3,168 $400 Not Implemented
UD0076 # 01 Y:1983 01 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,494 $421 Not Implemented
UD0076 # 02 Y:1983 02 1983 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $427 $250 Not Implemented
UD0076 # 03 Y:1983 03 1983 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $990 $438 Not Implemented
UD0079 # 01 Y:1983 01 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,269 $548 Not Implemented
UD0079 # 02 Y:1983 02 1983 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,212 $1,000 Not Implemented
UD0080 # 01 Y:1983 01 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,599 $1,472 Not Implemented
UD0080 # 02 Y:1983 02 1983 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $13,125 $53,100 Not Implemented
UD0080 # 03 Y:1983 03 1983 INSTALL STORM WINDOWS AND DOORS $12,524 $20,450 Not Implemented
UD0080 # 04 Y:1983 04 1983 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,981 $7,000 Not Implemented
UD0081 # 01 Y:1983 01 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $424 $341 Implemented
UD0081 # 02 Y:1983 02 1983 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,911 $0 Implemented
UD0081 # 03 Y:1983 03 1983 INSULATE BARE EQUIPMENT $3,417 $188 Implemented
UD0082 # 01 Y:1983 01 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $820 $206 Not Implemented
UD0082 # 02 Y:1983 02 1983 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $170 $0 Not Implemented