Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
161,320
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0019 # 01 Y:1982 | 01 | 1982 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $550 | $150 | Implemented |
UD0019 # 02 Y:1982 | 02 | 1982 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,596 | $5,400 | Implemented |
UD0020 # 01 Y:1982 | 01 | 1982 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $20,824 | $30,000 | Implemented |
UD0020 # 02 Y:1982 | 02 | 1982 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $430 | $300 | Implemented |
UD0020 # 03 Y:1982 | 03 | 1982 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $138 | $350 | Not Implemented |
UD0021 # 01 Y:1982 | 01 | 1982 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,609 | $576 | Implemented |
UD0021 # 02 Y:1982 | 02 | 1982 | INSTALL STORM WINDOWS AND DOORS | $330 | $314 | Implemented |
UD0021 # 03 Y:1982 | 03 | 1982 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $3,366 | $37,700 | Not Implemented |
UD0022 # 01 Y:1982 | 01 | 1982 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $1,141 | $45 | Implemented |
UD0022 # 02 Y:1982 | 02 | 1982 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,497 | $700 | Not Implemented |
UD0022 # 03 Y:1982 | 03 | 1982 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $39,185 | $33,000 | Implemented |
UD0023 # 01 Y:1982 | 01 | 1982 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $7,104 | $6,705 | Implemented |
UD0023 # 02 Y:1982 | 02 | 1982 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $14,006 | $3,864 | Implemented |
UD0023 # 03 Y:1982 | 03 | 1982 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,266 | $300 | Implemented |
UD0024 # 01 Y:1982 | 01 | 1982 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $611 | $350 | Not Implemented |
UD0024 # 02 Y:1982 | 02 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,472 | $0 | Not Implemented |
UD0024 # 03 Y:1982 | 03 | 1982 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $7,200 | $1,000 | Not Implemented |
TN0102 # 01 Y:1982 | 01 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $612 | $1,000 | Not Implemented |
TN0102 # 02 Y:1982 | 02 | 1982 | INSTALL / REPAIR INSULATION ON STEAM LINES | $5,782 | $4,500 | Not Implemented |
TN0102 # 03 Y:1982 | 03 | 1982 | INSULATE BARE EQUIPMENT | $3,389 | $4,000 | Not Implemented |
TN0102 # 04 Y:1982 | 04 | 1982 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $3,134 | $12,000 | Not Implemented |
TN0103 # 01 Y:1982 | 01 | 1982 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $553 | $400 | Not Implemented |
TN0103 # 02 Y:1982 | 02 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,426 | $446 | Not Implemented |
TN0103 # 03 Y:1982 | 03 | 1982 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,421 | $0 | Not Implemented |
TN0103 # 04 Y:1982 | 04 | 1982 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,089 | $150 | Not Implemented |