Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
161,320
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TN0113 # 03 Y:1982 | 03 | 1982 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,005 | $0 | Not Implemented |
TN0113 # 04 Y:1982 | 04 | 1982 | OPTIMIZE PLANT POWER FACTOR | $4,718 | $2,000 | Not Implemented |
TN0114 # 01 Y:1982 | 01 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $107 | $380 | Not Implemented |
TN0114 # 02 Y:1982 | 02 | 1982 | INSTALL STORM WINDOWS AND DOORS | $82 | $100 | Not Implemented |
TN0114 # 03 Y:1982 | 03 | 1982 | RECOVER WASTE HEAT FROM EQUIPMENT | $60 | $100 | Not Implemented |
TN0115 # 01 Y:1982 | 01 | 1982 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,980 | $0 | Not Implemented |
TN0115 # 02 Y:1982 | 02 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,127 | $0 | Not Implemented |
TN0115 # 03 Y:1982 | 03 | 1982 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $2,747 | $400 | Not Implemented |
GT0110 # 01 Y:1982 | 01 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $160 | $154 | Not Implemented |
GT0110 # 02 Y:1982 | 02 | 1982 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $842 | $1,110 | Implemented |
GT0110 # 03 Y:1982 | 03 | 1982 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $2,455 | $3,730 | Implemented |
GT0110 # 04 Y:1982 | 04 | 1982 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $1,087 | $5,383 | Not Implemented |
GT0111 # 01 Y:1982 | 01 | 1982 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $814 | $0 | Implemented |
GT0111 # 02 Y:1982 | 02 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,092 | $597 | Implemented |
GT0111 # 03 Y:1982 | 03 | 1982 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $125 | $25 | Implemented |
UD0018 # 01 Y:1981 | 01 | 1981 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $610 | $45 | Not Implemented |
UD0018 # 02 Y:1981 | 02 | 1981 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $9,469 | $32,000 | Not Implemented |
UD0018 # 03 Y:1981 | 03 | 1981 | USE OPTIMUM THICKNESS INSULATION | $445 | $0 | Implemented |
UD0018 # 04 Y:1981 | 04 | 1981 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $94 | $60 | Implemented |
UD0018 # 05 Y:1981 | 05 | 1981 | INSULATE BARE EQUIPMENT | $10,990 | $10,000 | Not Implemented |
KU0024 # 01 Y:1981 | 01 | 1981 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $1,669 | $2,600 | Not Implemented |
KU0024 # 02 Y:1981 | 02 | 1981 | INSTALL TIMERS AND/OR THERMOSTATS | $556 | $0 | Not Implemented |
KU0024 # 03 Y:1981 | 03 | 1981 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $349 | $357 | Not Implemented |
KU0025 # 01 Y:1981 | 01 | 1981 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $169 | $100 | Implemented |
KU0025 # 02 Y:1981 | 02 | 1981 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $1,267 | $1,200 | Not Implemented |