IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

161,963

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0035 # 01 Y:1982 01 1982 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $70 $150 Implemented
UD0035 # 02 Y:1982 02 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $938 $258 Implemented
UD0035 # 03 Y:1982 03 1982 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $4,933 $2,000 Not Implemented
UD0035 # 04 Y:1982 04 1982 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,768 $1,700 Implemented
UD0035 # 05 Y:1982 05 1982 REDUCE VENTILATION AIR $180 $150 Not Implemented
UD0036 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,160 $3,500 Not Implemented
UD0036 # 02 Y:1982 02 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $11,000 $20,000 Not Implemented
UD0036 # 03 Y:1982 03 1982 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $1,018 $112 Not Implemented
UD0036 # 04 Y:1982 04 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,120 $5,535 Implemented
UD0036 # 05 Y:1982 05 1982 RECOVER WASTE HEAT FROM EQUIPMENT $1,834 $6,650 Not Implemented
UD0036 # 06 Y:1982 06 1982 REDUCE VENTILATION AIR $3,333 $5 Not Implemented
UD0036 # 07 Y:1982 07 1982 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,551 $5,000 Not Implemented
TN0121 # 01 Y:1982 01 1982 INSTALL SET-BACK TIMERS $1,720 $0 Not Implemented
TN0121 # 02 Y:1982 02 1982 INSTALL TIMERS AND/OR THERMOSTATS $953 $0 Not Implemented
TN0121 # 03 Y:1982 03 1982 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $485 $700 Not Implemented
TN0123 # 01 Y:1982 01 1982 REPAIR AND ELIMINATE STEAM LEAKS $30,377 $1,280 Not Implemented
TN0123 # 02 Y:1982 02 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,019 $2,840 Not Implemented
TN0123 # 03 Y:1982 03 1982 REPAIR OR REPLACE STEAM TRAPS $10,191 $480 Not Implemented
TN0123 # 04 Y:1982 04 1982 INSULATE BARE EQUIPMENT $26,503 $3,460 Not Implemented
TN0123 # 05 Y:1982 05 1982 INSTALL / REPAIR INSULATION ON STEAM LINES $2,334 $230 Not Implemented
TN0123 # 06 Y:1982 06 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $24,808 $200 Not Implemented
TN0123 # 07 Y:1982 07 1982 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $72,394 $7,328 Not Implemented
TN0125 # 01 Y:1982 01 1982 INSTALL SET-BACK TIMERS $6,284 $0 Not Implemented
TN0125 # 02 Y:1982 02 1982 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $4,900 $0 Not Implemented
TN0125 # 03 Y:1982 03 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,430 $0 Not Implemented