Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
162,169
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TN0130 # 01 Y:1982 | 01 | 1982 | TURN OFF EQUIPMENT WHEN NOT IN USE | $15,419 | $3,500 | Not Implemented |
TN0130 # 02 Y:1982 | 02 | 1982 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $7,571 | $5,400 | Not Implemented |
TN0130 # 03 Y:1982 | 03 | 1982 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,269 | $1,000 | Not Implemented |
TN0130 # 04 Y:1982 | 04 | 1982 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $1,775 | $3,320 | Not Implemented |
TN0131 # 01 Y:1982 | 01 | 1982 | INSTALL / REPAIR INSULATION ON STEAM LINES | $10,264 | $3,000 | Not Implemented |
TN0131 # 02 Y:1982 | 02 | 1982 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $1,109 | $2,700 | Not Implemented |
TN0131 # 03 Y:1982 | 03 | 1982 | RECOVER WASTE HEAT FROM EQUIPMENT | $632 | $2,800 | Not Implemented |
TN0132 # 01 Y:1982 | 01 | 1982 | COVER OPEN TANKS | $790 | $200 | Not Implemented |
TN0132 # 02 Y:1982 | 02 | 1982 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $340 | $0 | Not Implemented |
TN0132 # 03 Y:1982 | 03 | 1982 | OPTIMIZE PLANT POWER FACTOR | $3,200 | $5,000 | Not Implemented |
UD0039 # 02 Y:1982 | 02 | 1982 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $480 | $0 | Implemented |
UD0039 # 03 Y:1982 | 03 | 1982 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $357 | $300 | Implemented |
UD0039 # 04 Y:1982 | 04 | 1982 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $7,302 | $13,500 | Implemented |
UD0039 # 05 Y:1982 | 05 | 1982 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $1,253 | $7,000 | Implemented |
UD0040 # 01 Y:1982 | 01 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,038 | $760 | Not Implemented |
UD0040 # 02 Y:1982 | 02 | 1982 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $176 | $300 | Implemented |
UD0040 # 03 Y:1982 | 03 | 1982 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $424 | $0 | Implemented |
UD0040 # 04 Y:1982 | 04 | 1982 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $363 | $24 | Not Implemented |
UD0037 # 01 Y:1982 | 01 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $935 | $379 | Not Implemented |
UD0037 # 02 Y:1982 | 02 | 1982 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $350 | $0 | Not Implemented |
UD0037 # 03 Y:1982 | 03 | 1982 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,116 | $300 | Not Implemented |
UD0037 # 04 Y:1982 | 04 | 1982 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,573 | $3,500 | Implemented |
UD0037 # 05 Y:1982 | 05 | 1982 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $1,974 | $6,500 | Not Implemented |
UD0038 # 01 Y:1982 | 01 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,301 | $50 | Implemented |
UD0038 # 02 Y:1982 | 02 | 1982 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $721 | $0 | Implemented |