Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
161,963
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0045 # 06 Y:1982 | 06 | 1982 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $461 | $100 | Not Implemented |
KU0045 # 07 Y:1982 | 07 | 1982 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $547 | $0 | Implemented |
KU0045 # 08 Y:1982 | 08 | 1982 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $417 | $0 | Implemented |
GT0115 # 01 Y:1982 | 01 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,119 | $2,000 | Not Implemented |
GT0115 # 02 Y:1982 | 02 | 1982 | INSTALL TIMERS AND/OR THERMOSTATS | $2,512 | $273 | Not Implemented |
GT0115 # 03 Y:1982 | 03 | 1982 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $558 | $1,440 | Not Implemented |
GT0116 # 01 Y:1982 | 01 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,021 | $400 | Implemented |
GT0116 # 02 Y:1982 | 02 | 1982 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $9,712 | $0 | Implemented |
GT0116 # 03 Y:1982 | 03 | 1982 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $1,841 | $0 | Implemented |
GT0116 # 04 Y:1982 | 04 | 1982 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,272 | $150 | Implemented |
GT0117 # 01 Y:1982 | 01 | 1982 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,518 | $2,760 | Not Implemented |
GT0117 # 02 Y:1982 | 02 | 1982 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $7,669 | $5,792 | Not Implemented |
GT0117 # 03 Y:1982 | 03 | 1982 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $7,298 | $1,500 | Not Implemented |
GT0117 # 04 Y:1982 | 04 | 1982 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $310 | $500 | Not Implemented |
GT0118 # 01 Y:1982 | 01 | 1982 | AIR CONDITION ONLY SPACE NECESSARY | $5,952 | $573 | Not Implemented |
GT0118 # 03 Y:1982 | 03 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,187 | $608 | Not Implemented |
GT0118 # 04 Y:1982 | 04 | 1982 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,676 | $198 | Not Implemented |
GT0125 # 01 Y:1982 | 01 | 1982 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,931 | $1,900 | Implemented |
GT0125 # 02 Y:1982 | 02 | 1982 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,067 | $400 | Implemented |
GT0125 # 03 Y:1982 | 03 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,124 | $6,215 | Implemented |
GT0125 # 04 Y:1982 | 04 | 1982 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $648 | $0 | Implemented |
GT0125 # 05 Y:1982 | 05 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $748 | $359 | Implemented |
UD0030 # 01 Y:1982 | 01 | 1982 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,014 | $0 | Implemented |
UD0030 # 02 Y:1982 | 02 | 1982 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $116 | $250 | Not Implemented |
UD0030 # 03 Y:1982 | 03 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $995 | $210 | Implemented |