Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
161,963
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0027 # 03 Y:1982 | 03 | 1982 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,458 | $0 | Not Implemented |
UD0028 # 01 Y:1982 | 01 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $828 | $482 | Implemented |
UD0028 # 02 Y:1982 | 02 | 1982 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $7,052 | $0 | Implemented |
UD0028 # 03 Y:1982 | 03 | 1982 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $205 | $400 | Not Implemented |
UD0028 # 04 Y:1982 | 04 | 1982 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $516 | $250 | Implemented |
UD0029 # 01 Y:1982 | 01 | 1982 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,289 | $500 | Not Implemented |
UD0029 # 02 Y:1982 | 02 | 1982 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $972 | $0 | Not Implemented |
UD0029 # 03 Y:1982 | 03 | 1982 | INSTALL / REPAIR INSULATION ON STEAM LINES | $7,697 | $5,000 | Not Implemented |
GT0112 # 01 Y:1982 | 01 | 1982 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $11,062 | $2,400 | Implemented |
GT0112 # 02 Y:1982 | 02 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $973 | $506 | Implemented |
GT0112 # 03 Y:1982 | 03 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,411 | $5,029 | Implemented |
GT0112 # 04 Y:1982 | 04 | 1982 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,125 | $1,500 | Implemented |
GT0112 # 05 Y:1982 | 05 | 1982 | USE OPTIMUM THICKNESS INSULATION | $3,585 | $5,294 | Implemented |
GT0112 # 06 Y:1982 | 06 | 1982 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,835 | $0 | Implemented |
GT0112 # 07 Y:1982 | 07 | 1982 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $656 | $0 | Implemented |
GT0112 # 08 Y:1982 | 08 | 1982 | RECOVER WASTE HEAT FROM EQUIPMENT | $27,024 | $31,500 | Implemented |
GT0112 # 09 Y:1982 | 09 | 1982 | BURN WASTE PAPER FOR HEAT | $106,600 | $200,000 | Not Implemented |
GT0113 # 01 Y:1982 | 01 | 1982 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,711 | $600 | Not Implemented |
GT0113 # 02 Y:1982 | 02 | 1982 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,811 | $1,258 | Not Implemented |
GT0113 # 03 Y:1982 | 03 | 1982 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $9,406 | $50,000 | Not Implemented |
GT0113 # 04 Y:1982 | 04 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,896 | $90,825 | Not Implemented |
GT0114 # 01 Y:1982 | 01 | 1982 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $6,834 | $0 | Not Implemented |
GT0114 # 02 Y:1982 | 02 | 1982 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $2,795 | $500 | Not Implemented |
GT0114 # 03 Y:1982 | 03 | 1982 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $1,049 | $2,500 | Not Implemented |
GT0114 # 04 Y:1982 | 04 | 1982 | RECOVER WASTE HEAT FROM EQUIPMENT | $24,416 | $48,000 | Not Implemented |