Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,629
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0260 # 03 Y:1988 | 03 | 1988 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $1,025 | $2,000 | Implemented |
UD0260 # 04 Y:1988 | 04 | 1988 | USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD | $1,447 | $0 | Implemented |
UD0260 # 05 Y:1988 | 05 | 1988 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,399 | $180 | Implemented |
UD0260 # 06 Y:1988 | 06 | 1988 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,469 | $200 | Not Implemented |
UD0261 # 01 Y:1988 | 01 | 1988 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,051 | $0 | Not Implemented |
UD0261 # 02 Y:1988 | 02 | 1988 | RECOVER AND REUSE COOLING WATER | $3,120 | $6,000 | Implemented |
UD0261 # 03 Y:1988 | 03 | 1988 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,080 | $0 | Implemented |
UD0262 # 01 Y:1988 | 01 | 1988 | OPTIMIZE PLANT POWER FACTOR | $13,844 | $17,000 | Implemented |
UD0262 # 02 Y:1988 | 02 | 1988 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $794 | $60 | Not Implemented |
UD0262 # 03 Y:1988 | 03 | 1988 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,565 | $18,000 | Not Implemented |
UD0262 # 04 Y:1988 | 04 | 1988 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,829 | $0 | Not Implemented |
UD0262 # 05 Y:1988 | 05 | 1988 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $7,880 | $5,000 | Not Implemented |
UD0263 # 01 Y:1988 | 01 | 1988 | OPTIMIZE PLANT POWER FACTOR | $4,019 | $15,000 | Implemented |
UD0263 # 02 Y:1988 | 02 | 1988 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,000 | $0 | Not Implemented |
UD0263 # 03 Y:1988 | 03 | 1988 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,423 | $1,000 | Implemented |
UD0263 # 04 Y:1988 | 04 | 1988 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,534 | $0 | Not Implemented |
UD0263 # 05 Y:1988 | 05 | 1988 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,981 | $1,500 | Implemented |
UD0263 # 06 Y:1988 | 06 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,295 | $9,000 | Implemented |
WI0027 # 01 Y:1988 | 01 | 1988 | IMPROVE LUBRICATION PRACTICES | $5,446 | $0 | Not Implemented |
WI0027 # 02 Y:1988 | 02 | 1988 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,450 | $0 | Implemented |
WI0027 # 03 Y:1988 | 03 | 1988 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $890 | $1,400 | Not Implemented |
WI0027 # 04 Y:1988 | 04 | 1988 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,627 | $700 | Implemented |
WI0027 # 05 Y:1988 | 05 | 1988 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $171 | $0 | Not Implemented |
WI0027 # 06 Y:1988 | 06 | 1988 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $445 | $500 | Implemented |
WI0028 # 01 Y:1988 | 01 | 1988 | IMPROVE LUBRICATION PRACTICES | $11,017 | $0 | Implemented |