Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,520
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0580 # 08 Y:1999 | 08 | 1999 | FILTER AND REUSE HYDRAULIC OIL | $1,713 | $2,500 | Not Implemented |
UD0580 # 09 Y:1999 | 09 | 1999 | SWITCH TO A SOLVENT THAT CAN BE CLEANED AND RE-USED | $1,418 | $0 | Not Implemented |
UD0579 # 01 Y:1999 | 01 | 1999 | INSTALL AUTOMATIC PACKING EQUIPMENT | $250,000 | $325,000 | Not Implemented |
UD0579 # 02 Y:1999 | 02 | 1999 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $25,726 | $7,500 | Implemented |
UD0579 # 03 Y:1999 | 03 | 1999 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $9,050 | $8,000 | Implemented |
UD0579 # 04 Y:1999 | 04 | 1999 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $7,690 | $2,850 | Implemented |
UD0579 # 05 Y:1999 | 05 | 1999 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,782 | $2,000 | Not Implemented |
UD0579 # 06 Y:1999 | 06 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $910 | $0 | Implemented |
WI0358 # 01 Y:1999 | 01 | 1999 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $97,790 | $44,000 | Implemented |
WI0358 # 02 Y:1999 | 02 | 1999 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $92,705 | $0 | Not Implemented |
WI0358 # 03 Y:1999 | 03 | 1999 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $54,425 | $102,000 | Not Implemented |
WI0358 # 04 Y:1999 | 04 | 1999 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $7,803 | $13,900 | Not Implemented |
WI0358 # 05 Y:1999 | 05 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $6,466 | $200 | Not Implemented |
WI0358 # 06 Y:1999 | 06 | 1999 | INSULATE BARE EQUIPMENT | $1,096 | $3,850 | Not Implemented |
WI0358 # 07 Y:1999 | 07 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $331 | $107 | Implemented |
ND0328 # 01 Y:1999 | 01 | 1999 | PURCHASE RE-CONDITIONED MATERIAL INSTEAD OF NEW | $12,717 | $27,395 | Implemented |
ND0328 # 02 Y:1999 | 02 | 1999 | INSULATE BARE EQUIPMENT | $8,575 | $1,100 | Not Implemented |
ND0328 # 03 Y:1999 | 03 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $6,212 | $7,590 | Implemented |
ND0328 # 04 Y:1999 | 04 | 1999 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $912 | $950 | Implemented |
ND0328 # 05 Y:1999 | 05 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $892 | $200 | Not Implemented |
ND0328 # 06 Y:1999 | 06 | 1999 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $748 | $250 | Implemented |
ND0328 # 07 Y:1999 | 07 | 1999 | USE OPTIMUM THICKNESS INSULATION | $489 | $1,068 | Not Implemented |
ND0328 # 08 Y:1999 | 08 | 1999 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $285 | $0 | Implemented |
ND0328 # 09 Y:1999 | 09 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $293 | $350 | Not Implemented |
ND0328 # 10 Y:1999 | 10 | 1999 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $120 | $75 | Implemented |