IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,616

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0048 # 05 Y:2010 05 2010 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,545 $0 Implemented
UA0048 # 06 Y:2010 06 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,450 $0 Not Implemented
UA0048 # 07 Y:2010 07 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,230 $2,000 Implemented
UA0046 # 01 Y:2010 01 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,580 $0 Not Implemented
UA0046 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,060 $1,500 Implemented
UA0046 # 03 Y:2010 03 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,244 $810 Implemented
UA0046 # 04 Y:2010 04 2010 RECOVER WASTE HEAT FROM EQUIPMENT $9,752 $1,750 Not Implemented
UA0046 # 05 Y:2010 05 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,794 $8,625 Not Implemented
UA0046 # 06 Y:2010 06 2010 REMOVE UNNEEDED SERVICE LINES TO ELIMINATE POTENTIAL LEAKS $482 $1,000 Not Implemented
UA0046 # 07 Y:2010 07 2010 REMOVE UNNEEDED SERVICE LINES TO ELIMINATE POTENTIAL LEAKS $482 $1,500 Not Implemented
UA0045 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $65,946 $165,576 Not Implemented
UA0045 # 02 Y:2010 02 2010 INSTALL OCCUPANCY SENSORS $1,354 $253 Implemented
UA0045 # 03 Y:2010 03 2010 USE RADIANT HEATER FOR SPOT HEATING $53,011 $50,388 Not Implemented
UA0045 # 04 Y:2010 04 2010 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $29,964 $19,014 Not Implemented
UA0045 # 05 Y:2010 05 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,323 $0 Implemented
UA0045 # 06 Y:2010 06 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $35,672 $740 Not Implemented
UA0045 # 07 Y:2010 07 2010 RECOVER WASTE HEAT FROM EQUIPMENT $27,056 $4,100 Not Implemented
UA0045 # 08 Y:2010 08 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,605 $5,500 Implemented
UA0045 # 09 Y:2010 09 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,519 $3,616 Not Implemented
UA0045 # 10 Y:2010 10 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,837 $10,250 Not Implemented
UA0044 # 01 Y:2010 01 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,400 $0 Implemented
UA0044 # 02 Y:2010 02 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,187 $0 Implemented
UA0044 # 03 Y:2010 03 2010 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $31,813 $50,000 Implemented
UA0044 # 04 Y:2010 04 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $29,108 $0 Not Implemented
UA0044 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,303 $11,000 Implemented