Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,969
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0443 # 01 Y:1999 | 01 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,232 | $3,510 | Not Implemented |
MA0443 # 02 Y:1999 | 02 | 1999 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $656 | $150 | Implemented |
MA0443 # 03 Y:1999 | 03 | 1999 | INSTALL OCCUPANCY SENSORS | $927 | $325 | Implemented |
MA0443 # 04 Y:1999 | 04 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $287 | $1,975 | Implemented |
MA0443 # 05 Y:1999 | 05 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $792 | $60 | Implemented |
MA0443 # 06 Y:1999 | 06 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $169 | $160 | Not Implemented |
MA0445 # 01 Y:1999 | 01 | 1999 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $160,542 | $811,250 | Not Implemented |
MA0445 # 02 Y:1999 | 02 | 1999 | OPTIMIZE PLANT POWER FACTOR | $3,122 | $7,125 | Not Implemented |
MA0445 # 03 Y:1999 | 03 | 1999 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $1,546 | $472 | Implemented |
MA0445 # 04 Y:1999 | 04 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $353 | $1,090 | Implemented |
MA0444 # 01 Y:1999 | 01 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,858 | $0 | Implemented |
MA0444 # 02 Y:1999 | 02 | 1999 | OPTIMIZE PLANT POWER FACTOR | $303 | $117 | Implemented |
MA0444 # 03 Y:1999 | 03 | 1999 | INSTALL OCCUPANCY SENSORS | $322 | $248 | Implemented |
MA0444 # 04 Y:1999 | 04 | 1999 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $879 | $4,225 | Not Implemented |
MA0444 # 05 Y:1999 | 05 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $114 | $470 | Not Implemented |
MA0444 # 06 Y:1999 | 06 | 1999 | MODIFY STARTUP/SHUTDOWN TIMES | $3,766 | $0 | Not Implemented |
MA0441 # 01 Y:1999 | 01 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $21,168 | $5,704 | Implemented |
MA0441 # 02 Y:1999 | 02 | 1999 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $43,200 | $3,000 | Implemented |
MA0441 # 03 Y:1999 | 03 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $15,964 | $40,000 | Not Implemented |
MA0441 # 04 Y:1999 | 04 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,069 | $26,625 | Not Implemented |
MA0441 # 05 Y:1999 | 05 | 1999 | UPGRADE OBSOLETE EQUIPMENT | $789 | $0 | Implemented |
MA0441 # 06 Y:1999 | 06 | 1999 | INSULATE BARE EQUIPMENT | $632 | $2,250 | Implemented |
MA0440 # 01 Y:1999 | 01 | 1999 | CHANGE OPERATING CONDITIONS | $29,415 | $130,900 | Not Implemented |
MA0440 # 02 Y:1999 | 02 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,896 | $15,790 | Implemented |
MA0440 # 03 Y:1999 | 03 | 1999 | CHANGE OPERATING CONDITIONS | $2,562 | $27,140 | Not Implemented |