Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,644
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0372 # 13 Y:2014 | 13 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,361 | $7,792 | Not Implemented |
LE0372 # 14 Y:2014 | 14 | 2014 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,482 | $4,118 | Not Implemented |
LE0372 # 15 Y:2014 | 15 | 2014 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $13,408 | $64,631 | Not Implemented |
LE0371 # 01 Y:2014 | 01 | 2014 | ADJUST BURNERS FOR EFFICIENT OPERATION | $15,710 | $0 | Not Implemented |
LE0371 # 02 Y:2014 | 02 | 2014 | INSTALL TIMERS AND/OR THERMOSTATS | $3,996 | $0 | Not Implemented |
LE0371 # 03 Y:2014 | 03 | 2014 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $645 | $0 | Not Implemented |
LE0371 # 04 Y:2014 | 04 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,667 | $28 | Implemented |
LE0371 # 05 Y:2014 | 05 | 2014 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,001 | $14 | Implemented |
LE0371 # 06 Y:2014 | 06 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,119 | $317 | Not Implemented |
LE0371 # 07 Y:2014 | 07 | 2014 | INSTALL TIMERS AND/OR THERMOSTATS | $18,293 | $2,740 | Not Implemented |
LE0371 # 08 Y:2014 | 08 | 2014 | REPAIR OR REPLACE STEAM TRAPS | $963 | $400 | Not Implemented |
LE0371 # 09 Y:2014 | 09 | 2014 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $7,984 | $3,000 | Not Implemented |
LE0371 # 10 Y:2014 | 10 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $941 | $1,000 | Implemented |
LE0371 # 11 Y:2014 | 11 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,799 | $12,800 | Not Implemented |
LE0371 # 12 Y:2014 | 12 | 2014 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,819 | $4,118 | Not Implemented |
LE0371 # 13 Y:2014 | 13 | 2014 | REPAIR AND ELIMINATE STEAM LEAKS | $3,675 | $1,285 | Not Implemented |
LE0371 # 14 Y:2014 | 14 | 2014 | REPLACE BROKEN WINDOWS AND/OR WINDOW SASH | $1,091 | $4,140 | Implemented |
LE0371 # 15 Y:2014 | 15 | 2014 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,748 | $21,000 | Not Implemented |
LE0371 # 16 Y:2014 | 16 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,704 | $12,536 | Not Implemented |
LE0371 # 17 Y:2014 | 17 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $71 | $350 | Not Implemented |
DL0121 # 01 Y:2014 | 01 | 2014 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $31,300 | $0 | Not Implemented |
DL0121 # 02 Y:2014 | 02 | 2014 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,700 | $0 | Not Implemented |
DL0121 # 03 Y:2014 | 03 | 2014 | AIR CONDITION ONLY SPACE NECESSARY | $22,620 | $750 | Not Implemented |
DL0121 # 04 Y:2014 | 04 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $19,400 | $13,500 | Not Implemented |
DL0121 # 05 Y:2014 | 05 | 2014 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $7,400 | $28,000 | Not Implemented |