Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,640
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0277 # 13 Y:2001 | 13 | 2001 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $7,281 | $0 | Implemented |
UF0277 # 14 Y:2001 | 14 | 2001 | INSTALL AUTOMATIC PACKING EQUIPMENT | $7,280 | $0 | Not Implemented |
UF0277 # 15 Y:2001 | 15 | 2001 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $540,000 | $0 | Not Implemented |
MI0019 # 01 Y:2001 | 01 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $20,022 | $10,000 | n/a |
MI0019 # 02 Y:2001 | 02 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,044 | $312 | n/a |
MI0019 # 03 Y:2001 | 03 | 2001 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $8,400 | $2,000 | n/a |
MI0019 # 04 Y:2001 | 04 | 2001 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $2,290 | $2,530 | n/a |
MI0019 # 05 Y:2001 | 05 | 2001 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $8,266 | $14,000 | n/a |
MI0019 # 06 Y:2001 | 06 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $9,991 | $288 | n/a |
LE0120 # 01 Y:2001 | 01 | 2001 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $43,479 | $7,500 | Not Implemented |
LE0120 # 02 Y:2001 | 02 | 2001 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $3,995 | $1,000 | Implemented |
LE0120 # 03 Y:2001 | 03 | 2001 | IMPROVE LUBRICATION PRACTICES | $13,290 | $800 | Implemented |
LE0120 # 04 Y:2001 | 04 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $22,381 | $0 | Implemented |
LE0120 # 05 Y:2001 | 05 | 2001 | INSULATE BARE EQUIPMENT | $2,562 | $200 | Implemented |
LE0120 # 06 Y:2001 | 06 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $12,033 | $18,460 | Not Implemented |
OR0392 # 01 Y:2001 | 01 | 2001 | INSTALL EMISSIONS CONTROLS TO INCREASE CAPACITY | $6,372,100 | $5,833,000 | Not Implemented |
OR0392 # 02 Y:2001 | 02 | 2001 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $2,259,300 | $536,756 | Not Implemented |
OR0392 # 03 Y:2001 | 03 | 2001 | REPLACE DIRECT FIRED WITH STEAM HEAT | $96,000 | $144,600 | Not Implemented |
OR0392 # 04 Y:2001 | 04 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,400 | $7,500 | Implemented |
OR0392 # 05 Y:2001 | 05 | 2001 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $137,600 | $58,600 | Not Implemented |
OR0392 # 06 Y:2001 | 06 | 2001 | USE IMMERSION HEATING IN TANKS, MELTING POTS, ETC | $200,000 | $493,000 | Not Implemented |
OR0392 # 07 Y:2001 | 07 | 2001 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $149,400 | $426,960 | Not Implemented |
UD0630 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,607 | $720 | Implemented |
UD0630 # 02 Y:2001 | 02 | 2001 | OPTIMIZE PLANT POWER FACTOR | $11,232 | $5,000 | Implemented |
UD0630 # 03 Y:2001 | 03 | 2001 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,449 | $560 | Implemented |