Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,230
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0882 # 05 Y:2011 | 05 | 2011 | UPGRADE CONTROLS ON COMPRESSORS | $16,076 | $55,000 | Implemented |
GT0882 # 06 Y:2011 | 06 | 2011 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $31,792 | $136,000 | Implemented |
GT0882 # 07 Y:2011 | 07 | 2011 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $17,800 | $38,640 | Implemented |
GT0882 # 08 Y:2011 | 08 | 2011 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $85,358 | $222,000 | Not Implemented |
GT0882 # 09 Y:2011 | 09 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $47,117 | $155,150 | Implemented |
IC0184 # 01 Y:2011 | 01 | 2011 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $265,693 | $277,838 | Not Implemented |
IC0184 # 02 Y:2011 | 02 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,671 | $21,422 | Implemented |
IC0184 # 03 Y:2011 | 03 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,196 | $20,077 | Implemented |
IC0184 # 04 Y:2011 | 04 | 2011 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,215 | $5,303 | Implemented |
IC0184 # 05 Y:2011 | 05 | 2011 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,121 | $3,748 | Implemented |
IC0184 # 06 Y:2011 | 06 | 2011 | USE RADIANT HEATER FOR SPOT HEATING | $2,000 | $7,588 | Implemented |
IC0184 # 07 Y:2011 | 07 | 2011 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $65,425 | $345,000 | Not Implemented |
LE0319 # 01 Y:2011 | 01 | 2011 | MINIMIZE WATER USAGE | $66,284 | $168,000 | Not Implemented |
LE0319 # 02 Y:2011 | 02 | 2011 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $30,212 | $5,424 | Implemented |
LE0319 # 03 Y:2011 | 03 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $22,751 | $160 | Not Implemented |
LE0319 # 04 Y:2011 | 04 | 2011 | OPERATE BOILERS ON HIGH FIRE SETTING | $16,771 | $0 | Implemented |
LE0319 # 05 Y:2011 | 05 | 2011 | METER WASTE WATER | $10,797 | $3,240 | Not Implemented |
WV0428 # 01 Y:2011 | 01 | 2011 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $74,991 | $209,000 | Not Implemented |
WV0428 # 02 Y:2011 | 02 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $45,746 | $80,800 | Not Implemented |
WV0428 # 03 Y:2011 | 03 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $40,236 | $60,550 | Implemented |
WV0428 # 04 Y:2011 | 04 | 2011 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $12,157 | $24,000 | Not Implemented |
WV0428 # 05 Y:2011 | 05 | 2011 | DEVELOP A REPAIR/REPLACE POLICY | $11,317 | $815 | Implemented |
WV0428 # 06 Y:2011 | 06 | 2011 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $9,763 | $1,000 | Implemented |
WV0428 # 07 Y:2011 | 07 | 2011 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $8,107 | $9,060 | Not Implemented |
WV0428 # 08 Y:2011 | 08 | 2011 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $8,061 | $8,550 | Not Implemented |