IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,230

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0882 # 05 Y:2011 05 2011 UPGRADE CONTROLS ON COMPRESSORS $16,076 $55,000 Implemented
GT0882 # 06 Y:2011 06 2011 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $31,792 $136,000 Implemented
GT0882 # 07 Y:2011 07 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $17,800 $38,640 Implemented
GT0882 # 08 Y:2011 08 2011 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $85,358 $222,000 Not Implemented
GT0882 # 09 Y:2011 09 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $47,117 $155,150 Implemented
IC0184 # 01 Y:2011 01 2011 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $265,693 $277,838 Not Implemented
IC0184 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,671 $21,422 Implemented
IC0184 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,196 $20,077 Implemented
IC0184 # 04 Y:2011 04 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,215 $5,303 Implemented
IC0184 # 05 Y:2011 05 2011 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,121 $3,748 Implemented
IC0184 # 06 Y:2011 06 2011 USE RADIANT HEATER FOR SPOT HEATING $2,000 $7,588 Implemented
IC0184 # 07 Y:2011 07 2011 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $65,425 $345,000 Not Implemented
LE0319 # 01 Y:2011 01 2011 MINIMIZE WATER USAGE $66,284 $168,000 Not Implemented
LE0319 # 02 Y:2011 02 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $30,212 $5,424 Implemented
LE0319 # 03 Y:2011 03 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $22,751 $160 Not Implemented
LE0319 # 04 Y:2011 04 2011 OPERATE BOILERS ON HIGH FIRE SETTING $16,771 $0 Implemented
LE0319 # 05 Y:2011 05 2011 METER WASTE WATER $10,797 $3,240 Not Implemented
WV0428 # 01 Y:2011 01 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $74,991 $209,000 Not Implemented
WV0428 # 02 Y:2011 02 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $45,746 $80,800 Not Implemented
WV0428 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $40,236 $60,550 Implemented
WV0428 # 04 Y:2011 04 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $12,157 $24,000 Not Implemented
WV0428 # 05 Y:2011 05 2011 DEVELOP A REPAIR/REPLACE POLICY $11,317 $815 Implemented
WV0428 # 06 Y:2011 06 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,763 $1,000 Implemented
WV0428 # 07 Y:2011 07 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,107 $9,060 Not Implemented
WV0428 # 08 Y:2011 08 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,061 $8,550 Not Implemented