IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,996

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0095 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,715 $38,711 Implemented
MS0095 # 04 Y:1997 04 1997 DISCONNECT BALLASTS $1,814 $1,602 Not Implemented
MS0095 # 05 Y:1997 05 1997 INSULATE BARE EQUIPMENT $2,730 $6,255 Not Implemented
MS0095 # 06 Y:1997 06 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $41,338 $19,152 Not Implemented
MS0095 # 07 Y:1997 07 1997 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $45,259 $8,955 Implemented
MS0095 # 08 Y:1997 08 1997 DISTILL CONTAMINATED SOLVENTS FOR REUSE $142,935 $162,000 Not Implemented
NC0121 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $699 $219 Implemented
NC0121 # 02 Y:1997 02 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $999 $200 Implemented
NC0121 # 03 Y:1997 03 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $90 $250 Implemented
NC0121 # 04 Y:1997 04 1997 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $398 $1,998 Not Implemented
NC0121 # 05 Y:1997 05 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,503 $0 Implemented
NC0121 # 06 Y:1997 06 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $462 $355 Implemented
NC0121 # 07 Y:1997 07 1997 $7,488 $15,000 Implemented
NC0121 # 08 Y:1997 08 1997 $12,681 $50,000 Not Implemented
NC0121 # 09 Y:1997 09 1997 $1,375 $2,259 Implemented
GT0620 # 01 Y:1997 01 1997 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,454 $1,200 Not Implemented
GT0620 # 02 Y:1997 02 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $1,260 $1,870 Not Implemented
GT0620 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,270 $6,830 Implemented
GT0620 # 04 Y:1997 04 1997 USE OPTIMUM THICKNESS INSULATION $390 $900 Not Implemented
GT0620 # 05 Y:1997 05 1997 ELIMINATE LEAKS IN WATER LINES AND VALVES $55 $50 Implemented
GT0620 # 06 Y:1997 06 1997 $9,546 $50,000 Not Implemented
GT0625 # 01 Y:1997 01 1997 METER WASTE WATER $20,840 $0 Not Implemented
GT0625 # 02 Y:1997 02 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $46,500 $137,700 Not Implemented
GT0625 # 03 Y:1997 03 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,080 $400 Implemented
GT0625 # 04 Y:1997 04 1997 FILTER AND REUSE HYDRAULIC OIL $19,800 $7,150 Implemented