IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,640

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0718 # 02 Y:2001 02 2001 COMBINE UTILITY METERS $2,360 $0 n/a
GT0718 # 03 Y:2001 03 2001 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $645 $0 n/a
GT0718 # 04 Y:2001 04 2001 UPGRADE CONTROLS ON COMPRESSORS $1,625 $7,000 n/a
GT0718 # 05 Y:2001 05 2001 LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE $35,705 $3,500 n/a
GT0718 # 06 Y:2001 06 2001 INSTALL EQUIPMENT TO MOVE PRODUCT $99,000 $80,000 n/a
GT0718 # 07 Y:2001 07 2001 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $12,400 $30,000 n/a
GT0718 # 08 Y:2001 08 2001 USE WATER-BASED ADHESIVES $73,300 $20,000 n/a
GT0718 # 09 Y:2001 09 2001 COMBINE UTILITY METERS $127 $0 n/a
UD0629 # 01 Y:2001 01 2001 MOVE PRODUCT USING MECHANICAL MEANS $21,879 $25,000 Not Implemented
UD0629 # 02 Y:2001 02 2001 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $18,079 $15,000 n/a
UD0629 # 03 Y:2001 03 2001 REDUCE SCRAP PRODUCTION $15,862 $6,000 Not Implemented
UD0629 # 04 Y:2001 04 2001 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,324 $0 Not Implemented
UD0629 # 05 Y:2001 05 2001 INSULATE BARE EQUIPMENT $5,835 $1,760 Not Implemented
UD0629 # 06 Y:2001 06 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $5,200 $1,500 Not Implemented
UD0629 # 07 Y:2001 07 2001 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $3,907 $0 Implemented
UD0629 # 08 Y:2001 08 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,128 $0 Not Implemented
UD0629 # 09 Y:2001 09 2001 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $982 $250 Not Implemented
UD0629 # 10 Y:2001 10 2001 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $628 $300 Not Implemented
LL0116 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,494 $1,440 Implemented
LL0116 # 02 Y:2001 02 2001 REPLACE GASOLINE WITH DIESEL, LPG, OR NATURAL GAS $2,754 $1,480 Not Implemented
LL0116 # 03 Y:2001 03 2001 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,478 $1,000 Not Implemented
LL0116 # 04 Y:2001 04 2001 INSULATE BARE EQUIPMENT $16,464 $3,385 Implemented
LL0116 # 05 Y:2001 05 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,464 $0 Implemented
LL0116 # 06 Y:2001 06 2001 OPTIMIZE PLANT POWER FACTOR $17,053 $23,870 Not Implemented
AS0304 # 01 Y:2001 01 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $895 $120 Not Implemented