Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,640
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0718 # 02 Y:2001 | 02 | 2001 | COMBINE UTILITY METERS | $2,360 | $0 | n/a |
GT0718 # 03 Y:2001 | 03 | 2001 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $645 | $0 | n/a |
GT0718 # 04 Y:2001 | 04 | 2001 | UPGRADE CONTROLS ON COMPRESSORS | $1,625 | $7,000 | n/a |
GT0718 # 05 Y:2001 | 05 | 2001 | LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE | $35,705 | $3,500 | n/a |
GT0718 # 06 Y:2001 | 06 | 2001 | INSTALL EQUIPMENT TO MOVE PRODUCT | $99,000 | $80,000 | n/a |
GT0718 # 07 Y:2001 | 07 | 2001 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $12,400 | $30,000 | n/a |
GT0718 # 08 Y:2001 | 08 | 2001 | USE WATER-BASED ADHESIVES | $73,300 | $20,000 | n/a |
GT0718 # 09 Y:2001 | 09 | 2001 | COMBINE UTILITY METERS | $127 | $0 | n/a |
UD0629 # 01 Y:2001 | 01 | 2001 | MOVE PRODUCT USING MECHANICAL MEANS | $21,879 | $25,000 | Not Implemented |
UD0629 # 02 Y:2001 | 02 | 2001 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $18,079 | $15,000 | n/a |
UD0629 # 03 Y:2001 | 03 | 2001 | REDUCE SCRAP PRODUCTION | $15,862 | $6,000 | Not Implemented |
UD0629 # 04 Y:2001 | 04 | 2001 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $6,324 | $0 | Not Implemented |
UD0629 # 05 Y:2001 | 05 | 2001 | INSULATE BARE EQUIPMENT | $5,835 | $1,760 | Not Implemented |
UD0629 # 06 Y:2001 | 06 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $5,200 | $1,500 | Not Implemented |
UD0629 # 07 Y:2001 | 07 | 2001 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $3,907 | $0 | Implemented |
UD0629 # 08 Y:2001 | 08 | 2001 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,128 | $0 | Not Implemented |
UD0629 # 09 Y:2001 | 09 | 2001 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $982 | $250 | Not Implemented |
UD0629 # 10 Y:2001 | 10 | 2001 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $628 | $300 | Not Implemented |
LL0116 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,494 | $1,440 | Implemented |
LL0116 # 02 Y:2001 | 02 | 2001 | REPLACE GASOLINE WITH DIESEL, LPG, OR NATURAL GAS | $2,754 | $1,480 | Not Implemented |
LL0116 # 03 Y:2001 | 03 | 2001 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $6,478 | $1,000 | Not Implemented |
LL0116 # 04 Y:2001 | 04 | 2001 | INSULATE BARE EQUIPMENT | $16,464 | $3,385 | Implemented |
LL0116 # 05 Y:2001 | 05 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,464 | $0 | Implemented |
LL0116 # 06 Y:2001 | 06 | 2001 | OPTIMIZE PLANT POWER FACTOR | $17,053 | $23,870 | Not Implemented |
AS0304 # 01 Y:2001 | 01 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $895 | $120 | Not Implemented |