IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,708

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0517 # 04 Y:2002 04 2002 PAY BILLS ON TIME TO AVOID LATE FEES $6,528 $0 Implemented
MA0517 # 05 Y:2002 05 2002 INSULATE BARE EQUIPMENT $6,349 $9,636 Implemented
MA0517 # 06 Y:2002 06 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,140 $5,200 Implemented
MA0517 # 07 Y:2002 07 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,164 $2,500 Implemented
MA0517 # 08 Y:2002 08 2002 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $853 $1,515 Implemented
MA0518 # 01 Y:2002 01 2002 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $27,840 $56,000 Not Implemented
MA0518 # 02 Y:2002 02 2002 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $26,093 $28,000 Not Implemented
MA0518 # 03 Y:2002 03 2002 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $7,380 $34,000 Not Implemented
MA0518 # 04 Y:2002 04 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,756 $4,000 Implemented
MA0518 # 05 Y:2002 05 2002 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $2,648 $1,250 Implemented
MA0518 # 06 Y:2002 06 2002 INSULATE FEEDWATER TANK $847 $1,000 Implemented
LE0140 # 01 Y:2002 01 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,395 $1,000 Not Implemented
LE0140 # 02 Y:2002 02 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,492 $0 Not Implemented
LE0140 # 03 Y:2002 03 2002 OPTIMIZE PLANT POWER FACTOR $13,648 $33,900 Not Implemented
LE0140 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,017 $100 Not Implemented
LE0140 # 05 Y:2002 05 2002 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $10,644 $20,000 Not Implemented
IA0294 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,396 $581 Implemented
IA0294 # 02 Y:2002 02 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $999 $241 Implemented
IA0294 # 03 Y:2002 03 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $418 $16 Not Implemented
IA0294 # 04 Y:2002 04 2002 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $1,463 $0 Not Implemented
IA0294 # 05 Y:2002 05 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $12,482 $0 Implemented
IA0294 # 06 Y:2002 06 2002 INSTALL OCCUPANCY SENSORS $1,464 $1,663 Not Implemented
IA0294 # 07 Y:2002 07 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,844 $13,381 Implemented
IA0294 # 08 Y:2002 08 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,670 $0 Implemented
IA0294 # 09 Y:2002 09 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,312 $1,500 Implemented