Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,703
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0450 # 02 Y:2014 | 02 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,421 | $26,000 | Not Implemented |
UM0450 # 03 Y:2014 | 03 | 2014 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $23,065 | $22,600 | Not Implemented |
UM0450 # 04 Y:2014 | 04 | 2014 | REVISE SMOKE CLEANUP FROM OPERATIONS | $14,049 | $6,000 | Not Implemented |
SD0486 # 01 Y:2014 | 01 | 2014 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $75,586 | $286,300 | Not Implemented |
SD0486 # 02 Y:2014 | 02 | 2014 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $54,581 | $250,000 | Not Implemented |
SD0486 # 03 Y:2014 | 03 | 2014 | REDUCE SCRAP PRODUCTION | $29,967 | $30,993 | Not Implemented |
SD0486 # 04 Y:2014 | 04 | 2014 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $14,957 | $4,985 | Not Implemented |
SD0486 # 05 Y:2014 | 05 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,274 | $22,000 | Not Implemented |
SD0486 # 06 Y:2014 | 06 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,270 | $600 | Not Implemented |
SD0486 # 07 Y:2014 | 07 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $427 | $600 | Not Implemented |
BS0035 # 01 Y:2014 | 01 | 2014 | INSTALL OCCUPANCY SENSORS | $65 | $132 | Implemented |
BS0035 # 02 Y:2014 | 02 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,413 | $8,156 | Implemented |
BS0035 # 03 Y:2014 | 03 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $89 | $113 | Implemented |
BS0035 # 04 Y:2014 | 04 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $374 | $15 | Implemented |
BS0035 # 05 Y:2014 | 05 | 2014 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $6,366 | $24,165 | Implemented |
BS0035 # 06 Y:2014 | 06 | 2014 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $8,299 | $50 | Implemented |
BS0035 # 07 Y:2014 | 07 | 2014 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $7,773 | $13,800 | Not Implemented |
BS0035 # 08 Y:2014 | 08 | 2014 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $452 | $340 | Implemented |
SF0449 # 01 Y:2014 | 01 | 2014 | INSTALL SPECTRAL REFLECTORS / DELAMP | $660 | $280 | Implemented |
SF0449 # 02 Y:2014 | 02 | 2014 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $10,804 | $9,262 | Not Implemented |
SF0449 # 03 Y:2014 | 03 | 2014 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $317 | $307 | Not Implemented |
SF0449 # 04 Y:2014 | 04 | 2014 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $28,600 | $42,672 | Not Implemented |
SF0449 # 05 Y:2014 | 05 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,630 | $27,842 | Implemented |
SF0449 # 06 Y:2014 | 06 | 2014 | INSTALL OCCUPANCY SENSORS | $2,997 | $14,024 | Not Implemented |
NC0515 # 01 Y:2014 | 01 | 2014 | ADOPT IN-HOUSE MATERIAL GENERATION | $26,905 | $50,000 | Not Implemented |