IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,283

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0652 # 06 Y:2020 06 2020 CONDENSE OPERATION INTO ONE BUILDING $6,086 $4,800 Not Implemented
NC0653 # 01 Y:2020 01 2020 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $19,814 $4,460 Not Implemented
NC0653 # 02 Y:2020 02 2020 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $22,483 $4,000 Not Implemented
NC0653 # 03 Y:2020 03 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $382,429 $2,300,000 Not Implemented
NC0651 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,900 $12,818 Implemented
NC0651 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $754 $780 Implemented
NC0651 # 03 Y:2020 03 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $949 $1,729 Not Implemented
NC0651 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,407 $1,500 Not Implemented
NC0651 # 05 Y:2020 05 2020 RECOVER WASTE HEAT FROM EQUIPMENT $1,263 $5,000 Not Implemented
NC0649 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,910 $26,602 Implemented
NC0649 # 02 Y:2020 02 2020 INSTALL OCCUPANCY SENSORS $1,430 $5,129 Implemented
NC0649 # 03 Y:2020 03 2020 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $13,044 $500 Implemented
NC0649 # 04 Y:2020 04 2020 COMBINE UTILITY METERS $1,914 $500 Not Implemented
NC0650 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,107 $210 Not Implemented
NC0650 # 02 Y:2020 02 2020 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $18,080 $500 Not Implemented
NC0650 # 03 Y:2020 03 2020 INSTALL / REPAIR INSULATION ON STEAM LINES $2,430 $997 Implemented
NC0650 # 04 Y:2020 04 2020 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $9,651 $8,000 Not Implemented
NC0650 # 05 Y:2020 05 2020 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $955 $2,350 Implemented
NC0650 # 06 Y:2020 06 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,730 $1,200 Implemented
NC0650 # 07 Y:2020 07 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,314 $20,000 Implemented
NC0648 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,352 $169,512 Implemented
NC0648 # 02 Y:2020 02 2020 INSTALL OCCUPANCY SENSORS $7,874 $10,949 Implemented
NC0648 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $251 $75 Implemented
NC0648 # 04 Y:2020 04 2020 INSULATE BARE EQUIPMENT $907 $1,200 Implemented
NC0647 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,099 $20,000 Not Implemented