Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
998
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0352 # 03 Y:2003 | 03 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,619 | $120 | Implemented |
AS0352 # 04 Y:2003 | 04 | 2003 | USE HEAT PUMP FOR SPACE CONDITIONING | $4,075 | $700 | Not Implemented |
AS0352 # 05 Y:2003 | 05 | 2003 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $194 | $0 | Implemented |
AS0352 # 06 Y:2003 | 06 | 2003 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $29,631 | $1,380 | Implemented |
AS0352 # 07 Y:2003 | 07 | 2003 | CLEAR AND RENT EXISTING SPACE | $12,132 | $9,260 | Implemented |
AS0351 # 01 Y:2003 | 01 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $110 | $15 | Not Implemented |
AS0351 # 02 Y:2003 | 02 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,729 | $60 | Implemented |
AS0351 # 03 Y:2003 | 03 | 2003 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $462 | $1,000 | Not Implemented |
AS0351 # 04 Y:2003 | 04 | 2003 | BURN A LESS EXPENSIVE GRADE OF FUEL | $26,419 | $6,500 | Implemented |
AS0351 # 05 Y:2003 | 05 | 2003 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $10,220 | $805 | Implemented |
AS0350 # 01 Y:2003 | 01 | 2003 | INSTALL SKYLIGHTS | $2,149 | $8,264 | Not Implemented |
AS0350 # 02 Y:2003 | 02 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,205 | $255 | Not Implemented |
AS0350 # 03 Y:2003 | 03 | 2003 | INSTALL OCCUPANCY SENSORS | $1,132 | $1,575 | Not Implemented |
AS0350 # 04 Y:2003 | 04 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,590 | $20 | Not Implemented |
AS0350 # 05 Y:2003 | 05 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,725 | $2,550 | Not Implemented |
AS0350 # 06 Y:2003 | 06 | 2003 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $921 | $1,300 | Not Implemented |
AS0350 # 07 Y:2003 | 07 | 2003 | INSTALL AUTOMATIC PACKING EQUIPMENT | $40,475 | $57,000 | Not Implemented |
AS0349 # 01 Y:2003 | 01 | 2003 | INSTALL OCCUPANCY SENSORS | $758 | $975 | Implemented |
AS0349 # 02 Y:2003 | 02 | 2003 | INSTALL SKYLIGHTS | $15,856 | $33,200 | n/a |
AS0349 # 03 Y:2003 | 03 | 2003 | INSULATE BARE EQUIPMENT | $6,729 | $9,784 | n/a |
AS0349 # 04 Y:2003 | 04 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,062 | $56 | Implemented |
AS0349 # 05 Y:2003 | 05 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $16,556 | $1,316 | Implemented |
AS0349 # 06 Y:2003 | 06 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,435 | $5,084 | Implemented |
AS0349 # 07 Y:2003 | 07 | 2003 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,638 | $7,500 | Implemented |
AS0349 # 08 Y:2003 | 08 | 2003 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $878,532 | $1,880,000 | n/a |