Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,640
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0496 # 02 Y:2001 | 02 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,560 | $5,260 | Not Implemented |
CO0496 # 03 Y:2001 | 03 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,240 | $220 | Not Implemented |
CO0496 # 04 Y:2001 | 04 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $190 | $0 | Not Implemented |
CO0496 # 05 Y:2001 | 05 | 2001 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $104,330 | $20,000 | Not Implemented |
CO0496 # 06 Y:2001 | 06 | 2001 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $68,550 | $3,360 | Not Implemented |
CO0496 # 07 Y:2001 | 07 | 2001 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $12,610 | $0 | Not Implemented |
GT0722 # 01 Y:2001 | 01 | 2001 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $16,455 | $5,110 | Implemented |
GT0722 # 02 Y:2001 | 02 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $851 | $2,902 | Implemented |
GT0722 # 03 Y:2001 | 03 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $351 | $727 | Not Implemented |
GT0722 # 04 Y:2001 | 04 | 2001 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $6,753 | $18,500 | Not Implemented |
GT0722 # 05 Y:2001 | 05 | 2001 | INSULATE FEEDWATER TANK | $153 | $220 | Implemented |
GT0722 # 06 Y:2001 | 06 | 2001 | INSULATE BARE EQUIPMENT | $2,786 | $4,000 | Not Implemented |
WI0408 # 01 Y:2001 | 01 | 2001 | MODIFY WORKLOAD | $33,405 | $30,000 | n/a |
WI0408 # 02 Y:2001 | 02 | 2001 | MINIMIZE WATER USAGE | $29,411 | $2,200 | n/a |
WI0408 # 03 Y:2001 | 03 | 2001 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $23,329 | $31,000 | n/a |
WI0408 # 04 Y:2001 | 04 | 2001 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $20,025 | $0 | n/a |
WI0408 # 05 Y:2001 | 05 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $14,442 | $6,917 | n/a |
WI0408 # 06 Y:2001 | 06 | 2001 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $11,596 | $12,000 | n/a |
WI0408 # 07 Y:2001 | 07 | 2001 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,941 | $11,250 | n/a |
WI0408 # 08 Y:2001 | 08 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,476 | $6,957 | n/a |
UF0288 # 01 Y:2001 | 01 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,662 | $6,465 | Not Implemented |
UF0288 # 02 Y:2001 | 02 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,358 | $500 | Implemented |
UF0288 # 03 Y:2001 | 03 | 2001 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $18,443 | $30,000 | Not Implemented |
UF0288 # 04 Y:2001 | 04 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,155 | $0 | Implemented |
UF0288 # 05 Y:2001 | 05 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $800 | $2,000 | Not Implemented |