IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,105

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0543 # 01 Y:2003 01 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $28,705 $21,900 n/a
MA0543 # 02 Y:2003 02 2003 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $26,717 $40,000 Not Implemented
MA0543 # 03 Y:2003 03 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,265 $0 Not Implemented
MA0543 # 04 Y:2003 04 2003 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $5,292 $0 Not Implemented
MA0543 # 05 Y:2003 05 2003 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $3,953 $12,400 Not Implemented
MA0543 # 06 Y:2003 06 2003 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,571 $12,104 Implemented
MA0543 # 07 Y:2003 07 2003 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,408 $527 Implemented
NC0274 # 01 Y:2003 01 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $18,125 $77,500 Not Implemented
NC0274 # 02 Y:2003 02 2003 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $36,152 $81,000 Not Implemented
NC0274 # 03 Y:2003 03 2003 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,209 $200 Implemented
NC0274 # 04 Y:2003 04 2003 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $9,743 $36,000 Not Implemented
NC0274 # 05 Y:2003 05 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,021 $1,000 Implemented
NC0274 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,705 $2,885 Not Implemented
CO0536 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,720 $16,720 Not Implemented
CO0536 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,530 $1,050 Implemented
CO0536 # 03 Y:2003 03 2003 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $3,380 $8,630 Not Implemented
CO0536 # 04 Y:2003 04 2003 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,310 $870 Not Implemented
CO0536 # 05 Y:2003 05 2003 RECOVER WASTE HEAT FROM EQUIPMENT $2,750 $1,410 Not Implemented
CO0536 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,299 $132 Not Implemented
CO0536 # 07 Y:2003 07 2003 IMPROVE SPACE COMFORT CONDITIONING $50,000 $301,060 Not Implemented
IC0071 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,267 $44,109 Not Implemented
IC0071 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,851 $32,696 Not Implemented
IC0071 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,349 $3,502 Implemented
IC0071 # 04 Y:2003 04 2003 INSTALL OCCUPANCY SENSORS $3,423 $5,201 Not Implemented
IC0071 # 05 Y:2003 05 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,250 $3,184 Implemented